Quick answers
What is Port and coastal project by Shell Energy India Pvt. Ltd.?
This approved port and coastal project by Shell Energy India Pvt. Ltd. is in Hajira, Chorasi, Surat, Gujarat.
Who is building it?
The applicant is M/S. Shell Energy India Privet Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Jul 2026), as of 27 Nov 2026.
Where is it?
In Hajira, Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹24,400 crore.
When was it filed?
The application was filed on 22 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Jul 2026 |
| Application filed | 22 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | M/S. Shell Energy India Privet Limited |
| Project cost | ₹24,400 crore |
| Village / locality | Hajira |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08413 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Aug 2025 (this page) | Environmental approval granted | ₹24,400 crore | |
| Amendment filed 8 Jul 2024 | Cleared for impact study | ₹24,400 crore | |
| Amendment filed 4 May 2024 | Returned to applicant | 213.9 acres | ₹23,800 crore |
In context
12 applications in Surat since January 2022 are in the same category (Ports & coast): 9 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hajira, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Port and coastal project by Shell Energy India Pvt. Ltd. — cleared for impact study, 0 m away
- Transfer of Environmental Clearance granted to Sanghi Industries Limited for… — under environmental review, 700 m away
- Diversion of 38.8633 Ha of forest land — lapsed, 800 m away
- Proposed Expansion of Heavy Engineering Equipments Manufacturing Plant at A.… — lapsed, 850 m away
- Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing /… — lapsed, 1.3 km away
- Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing /… — lapsed, 1.3 km away
- Partial Change of Land-Use of 25.00 Ha. Unclassed Forest Land permitted for… — under forest review, 1.4 km away
- Partial Change of Land-Use of 7.34 Ha. out of total 25.00 Ha. Unclassed Forest… — under forest review, 1.4 km away
More from M/S. Shell Energy India Privet Limited in Surat
- Project by Shell Energy India Pvt. Ltd. — lapsed
- Project by Shell Energy India Pvt. Ltd. — cleared for impact study
All 5 Shell Energy India Privet projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.