Quick answers
What is this project?
Partial Change of Land-Use of 7.34 Ha. out of total 25.00 Ha. Unclassed Forest Land permitted for setting up Port Back-up Facilities, R.S. No. 434-A/1 (Part) is a proposed building project in Hajira, Chorasi, Surat, Gujarat. The site covers 18.1 acres.
Who is building it?
The applicant is Hcfs.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Hajira, Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹100.5 crore; a site of 18.1 acres and 18.1 acres (7.3 ha) of forest land.
When was it filed?
The application was filed on 11 Nov 2026.
Project details
| Official title | Proposal for Partial Change of Land-Use of 7.34 Ha. out of total 25.00 Ha. Unclassed Forest Land permitted for setting up Port Back-up Facilities, R.S. No. 434-A/1 (Part), at Village Hazira (Suvali), Ta. Choryasi, in favour of Hazira Container Freight Station Pvt. Ltd. (HCFS for short), Surat District, Gujarat State |
|---|---|
| Status | Under forest review |
| Status since | 11 Nov 2026 |
| Application filed | 11 Nov 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Buildings & townships |
| Applicant | Hcfs |
| Land area | 18.1 acres (7.3 ha) |
| Forest land | 18.1 acres (7.3 ha) |
| Project cost | ₹100.5 crore |
| Village / locality | Hajira |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15129 |
In context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 18.1 acres, this one is larger than 97% of them.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hajira, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Partial Change of Land-Use of 25.00 Ha. Unclassed Forest Land permitted for… — under forest review, 150 m away
- ArcelorMittal Nippon Steel 15.6 / 21 MTPA Steel Expansion Complex — under forest review, 200 m away
- AMNS 15.6 / 21 MTPA Steel Complex Expansion — in-principle approval, conditions pending, 300 m away
- Name change to ArcelorMittal Nippon Steel India Private Limited - Diversion of… — initial checks, 500 m away
- Diversion of 38.8633 Ha of forest land — lapsed, 650 m away
- Diversion of 0.2596 ha. of PF land for laying of 90 mm dia. MDPE Gas Pipeline… — forest land use approved, 1.1 km away
- Grant of Permission Required for laying of Drinking water pipeline, crossing /… — forest land use approved, 1.2 km away
- Diversion of 2.087 Ha Reserved Forest Land for Hazira Port Railway… — initial checks, 1.4 km away
More from Hcfs in Surat
- Partial Change of Land-Use of 25.00 Ha. Unclassed Forest Land permitted for… — under forest review
About this information