Quick answers
What is Shri Hakubhai Samantbhai Dhandhal?
Shri Hakubhai Samantbhai Dhandhal is a rejected mining project in Sankali, Wadhwan, Surendranagar, Gujarat. The site covers 2.5 acres.
Who is building it?
The applicant is Dhandhal Hakubhai Samatbhai.
Has it been approved?
No. The application was rejected on 21 Dec 2024.
Where is it?
In Sankali, Wadhwan, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹72 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 14 Sept 2024.
Project details
| Status | Not approved |
|---|---|
| Status since | 21 Dec 2024 |
| Application filed | 14 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dhandhal Hakubhai Samatbhai |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹72 lakh |
| Village / locality | Sankali |
| Taluk / tehsil | Wadhwan |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06513 |
In context
271 applications in Surendranagar since January 2022 are in the same category (Mining): 107 approved, 59 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Sankali, Wadhwan, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shi Mathurbhai Valjibhai Sakriya — environmental approval granted, 1.9 km away
- Shi Dashrathbhai Vashrambhai Nandiyaniya — environmental approval granted, 3.1 km away
- 765 kV D/c Halvad-Vataman Transmission Line (PVTL) — forest land use approved, 5.2 km away
- Proposed Expansion of Synthetic Organic Chemicals (Reactive Dyes)manufacturing… — environmental approval granted, 10.5 km away
- Imperial Mall — environmental approval granted, 11.8 km away
- Remodeling of S2- S3 Regional Water Supply Scheme of Surendranagar District… — forest land use approved, 13.1 km away
- 90mm Dia PE GAS PIPELINE for Laid on Both Side of SH-17 for Future… — forest land use approved, 13.3 km away
- Rajrishi Petroleum CNG Station Connectivity — forest land use approved, 13.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.