| Status | Environmental approval granted |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 31 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Deepak Chem Tech Limited |
| Land area | 114.4 acres (46.3 ha) |
| Project cost | ₹1,589 crore |
| Village / locality | Jolva |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08991 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 31 Mar 2025 (this page) | Environmental approval granted | 114.4 acres | ₹1,589 crore |
| Amendment filed 22 Nov 2024 | Environmental approval granted | 114.4 acres | ₹1,589 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 114.4 acres, this one is larger than 93% of them.
243 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jolva, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Amendment in Consent to Operate with Change in Product Mix… — initial checks, 0 m away
- Industrial project by M/s. Deepak Chem Tech Limited — environmental approval granted, 0 m away
- Proposed 8"Ø Steel Gas Pipeline from Tap-off Point(on Ex.8"Ø Steel Gas… — lapsed, 1 km away
- Industrial project by M/s. Filatex India Limited — environmental approval granted, 1 km away
- Industrial project by M/s. Filatex India Limited — environmental approval granted, 1 km away
- Industrial project by M/s. Filatex India Limited — cleared for impact study, 1 km away
- Raw Water Pipeline laying for Galanda Reservoir to D-II. — lapsed, 1.1 km away
- PROPOSED EXPANSION PROJECT FOR SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT… — cleared for impact study, 1.2 km away
More from Deepak Chem Tech Limited in Bharuch
- Diversion of Protected Forest land for laying of Proposed Raw Water Supply… — initial checks
- CRZ clearance for laying of 20 MLD treated effluent pipeline for Deepak Chem… — under coastal review
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — environmental approval granted
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — withdrawn
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — returned to applicant
- Application for Amendment in Consent to Operate with Change in Product Mix… — initial checks
All 9 Deepak Chem Tech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.