One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Greenfield Project of Petroleum and Petrochemical Based Processing Products and…
Project details
| Official title | Proposed Greenfield Project of Petroleum and Petrochemical Based Processing Products and 90 MW Captive Thermal Power Plant at Village Padariya, District Bharuch, Gujarat |
|---|---|
| Status | Returned to applicant |
| Status since | 12 Feb 2026 |
| Application filed | 16 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Deepak Chem Tech Limited |
| Land area | 157.5 acres (63.7 ha) |
| Project cost | ₹3,500 crore |
| Village / locality | Padariya |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10543 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Apr 2026 | Environmental approval granted | 157.5 acres | ₹3,500 crore |
| New project filed 8 Apr 2026 | Withdrawn | 157.5 acres | ₹3,500 crore |
| New project filed 16 Jan 2026 (this page) | Returned to applicant | 157.5 acres | ₹3,500 crore |
| Early planning filed 27 Dec 2024 | Cleared for impact study | 157.5 acres | ₹3,500 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 157.5 acres, this one is larger than 95% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Padariya, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — environmental approval granted, 0 m away
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — withdrawn, 0 m away
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — cleared for impact study, 0 m away
- CRZ clearance for laying of 20 MLD treated effluent pipeline for Deepak Chem… — under coastal review, 0 m away
- Industrial project by M/s. WILLOWOOD INDUSTRIES PVT LTD — initial checks, 2.7 km away
- Industrial project by M/s. WILLOWOOD INDUSTRIES PVT LTD — initial checks, 2.7 km away
- Industrial project by M/s. Willowood Industries Pvt. Ltd. — initial checks, 2.7 km away
- Industrial project by M/s. Willowood Industries Pvt. Ltd. — initial checks, 2.7 km away
More from Deepak Chem Tech Limited in Bharuch
- Diversion of Protected Forest land for laying of Proposed Raw Water Supply… — initial checks
- CRZ clearance for laying of 20 MLD treated effluent pipeline for Deepak Chem… — under coastal review
- Application for Amendment in Consent to Operate with Change in Product Mix… — initial checks
- Industrial project by M/s. Deepak Chem Tech Limited — environmental approval granted
- Industrial project by M/s. Deepak Chem Tech Limited — environmental approval granted
All 9 Deepak Chem Tech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.