Project details
| Official title | CRZ clearance for laying of 20 MLD treated effluent pipeline for Deepak Chem Tech Limited at Padariya village, Bharuch District, Gujarat. |
|---|---|
| Status | Under coastal review |
| Status since | 26 Nov 2026 |
| Application filed | 24 Oct 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Deepak Chem Tech Limited |
| Land area | 160.6 acres (65 ha) |
| Project cost | ₹89 crore |
| Village / locality | Kadodara |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14882 |
What the filings say
What is planned
Deepak Chem Tech Limited (DCTL) proposes to install a marine outfall system for the disposal of 20 MLD (million litres per day) of treated effluent. This project is part of an expansion of the company's existing facilities at Padariya village in Bharuch district. The system consists of an onshore pipeline, a Landfall Point (LFP), an offshore pipeline, and a diffuser system in the Gulf of Khambhat.
The pipeline infrastructure includes:
- A 6,625-metre land-based pipeline from the main plant to the Landfall Point.
- A 4,760-metre offshore pipeline extending from the Landfall Point to the marine outfall location.
- A multiport diffuser system at the end of the pipeline, featuring four ports of 250 mm diameter each to ensure high dilution of the effluent.
Layout and design
The outfall pipeline corridor was identified based on pre-lay surveys including bathymetry, seabed geology, and effluent dispersion studies. The applicant states that the seabed consists mostly of sand and is clear of obstacles. The diffuser is designed to sit on the sea floor with minimal projections to avoid risks to fishing boats and drift nets. The outfall location will be marked with lighted marker buoys for visibility at night.
Land and surroundings
The project is located in the Vagra taluk of Bharuch district. The pipeline route passes through several ecologically sensitive zones as per the Coastal Zone Management Plan (CZMP) 2019:
- Mangroves: The pipeline passes through mangrove areas for approximately 540 metres.
- Mudflats: The pipeline crosses mudflats for a distance of 3,257 metres.
- Salt marshes: These are located approximately 120 metres north of the pipeline corridor.
- Forests: The Dahej reserved forest boundary is situated 1.2 km south of the project site.
The applicant has prepared specific management plans for the mangrove and mudflat sections. No tree cutting is proposed for this project.
Environmental safeguards
The applicant's project report outlines several mitigation measures to minimize the impact on the marine environment:
- Construction Phase: Pipeline laying is expected to take one to two months. Activities will be confined to a narrow corridor to limit disturbance to benthic habitats and macrofauna. Turbidity, pH, and dissolved oxygen (DO) will be monitored during installation.
- Operational Phase: The multiport diffuser is designed to achieve maximum dilution. The discharge will comply with Central Pollution Control Board (CPCB) and Gujarat Pollution Control Board (GPCB) standards. The outfall site is located at a distance from the shore to prevent treated wastewater from reaching the coastline.
- Emergency Response: To address potential pipeline breakage due to natural hazards or man-made causes, the company plans to maintain a stock of spare pipeline segments and contract experienced divers for emergency repairs.
Water, power and access
Onshore construction activities will involve earth-moving machinery such as rollers and dozers. The applicant states that the project will not affect ground or surface water quality. Noise impacts during construction are expected to be localized and temporary, with the nearest human settlements located at least 3 km away from the site. Local manpower will be engaged for construction activities where possible.
| Item | Detail |
|---|---|
| Effluent Capacity | 20 MLD |
| Land Pipeline Length | 6,625 m |
| Marine Pipeline Length | 4,760 m |
| Diffuser Ports | 4 nos. x 250 mm dia. |
| Construction Duration | Approximately 2 months |
| Distance to Dahej Forest | 1.2 km |
| Mangrove Crossing | 540 m |
| Mudflat Crossing | 3,257 m |
CRZ Clearance for Laying of 20 MLD Treated Effluent Pipeline for Deepak Chem Tech Limited site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
58 applications in Bharuch since January 2022 are in the same category (Buildings & townships): 34 approved, 12 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 160.6 acres, this one is larger than 89% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kadodara, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — environmental approval granted, 0 m away
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — withdrawn, 0 m away
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — returned to applicant, 0 m away
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — cleared for impact study, 0 m away
- Industrial project by M/s. WILLOWOOD INDUSTRIES PVT LTD — initial checks, 2.7 km away
- Industrial project by M/s. WILLOWOOD INDUSTRIES PVT LTD — initial checks, 2.7 km away
- Industrial project by M/s. Willowood Industries Pvt. Ltd. — initial checks, 2.7 km away
- Industrial project by M/s. Willowood Industries Pvt. Ltd. — initial checks, 2.7 km away
More from Deepak Chem Tech Limited in Bharuch
- Diversion of Protected Forest land for laying of Proposed Raw Water Supply… — initial checks
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — environmental approval granted
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — withdrawn
- Proposed Greenfield Project of Petroleum and Petrochemical Based Processing… — returned to applicant
- Application for Amendment in Consent to Operate with Change in Product Mix… — initial checks
- Industrial project by M/s. Deepak Chem Tech Limited — environmental approval granted