Quick answers
What is The Venezia?
The Venezia is an approved residential project in Adalaj (Ct), Gandhinagar, Gujarat. It plans 146 units in 3 towers of up to 19 floors on 1.3 acres.
Who is building it?
The applicant is R M Enterprise.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Sept 2025), as of 27 Nov 2026.
Where is it?
In Adalaj (Ct), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹77.6 crore and a site of 1.3 acres.
When was it filed?
The application was filed on 13 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Sept 2025 |
| Application filed | 13 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | R M Enterprise |
| Use | Residential |
| Units | 146 |
| Towers | 3 |
| Floors (tallest) | 19 |
| Basements | 2 |
| Parking spaces | 297 |
| Land area | 1.3 acres (0.5 ha) |
| Built-up area | 38,534 m² (4,14,776 sq ft) |
| Plot area | 5,392 m² (58,039 sq ft) |
| Project cost | ₹77.6 crore |
| Village / locality | Adalaj (Ct) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09041 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 8 Apr 2026 | Under environmental review | 1.3 acres | ₹77.6 crore |
| New project filed 13 Apr 2025 (this page) | Environmental approval granted | 1.3 acres | ₹77.6 crore |
What the filings say
What is planned
The applicant, R M Enterprise, proposes a residential development consisting of three high-rise blocks. According to the project layout and environmental clearance documents, Blocks A and B are designed with two basements, a ground floor (hollow plinth), and 19 upper floors. Block C is planned with two basements, a ground floor, and 18 upper floors. The project will provide a total of 146 residential units.
Layout and design
The total built-up area for the project is 38,533.55 square metres, with a Floor Space Index (FSI) area of 21,561.95 square metres. The site includes a common plot of 616.48 square metres. Parking is distributed across the two basement levels and the hollow plinth, providing a total of 297 car parking spaces. The building design incorporates four lifts for Block A and two lifts each for Blocks B and C, including dedicated fire lifts.
| Item | Detail |
|---|---|
| Total Residential Units | 146 |
| Number of Blocks | 3 |
| Tallest Building Height | G+19 floors |
| Total Built-up Area | 38,533.55 sq. m. |
| STP Capacity | 150 KLD |
| Car Parking Spaces | 297 |
| Green Belt Area | 616.48 sq. m. |
| CER Allocation | ₹1.56 crore |
Water, power and access
During the operation phase, the total water requirement is estimated at 164.03 kilolitres per day (KLD). The applicant's report states that 113.27 KLD will be fresh water sourced from the local authority, while 50.76 KLD will be recycled treated water used for flushing and gardening. A Sewage Treatment Plant (STP) with a capacity of 150 KLD is proposed to treat 125.04 KLD of generated sewage.
For back-up power, the applicant plans to install one 125 KVA diesel generator set equipped with an acoustic enclosure. Access to the site is provided via an 18-metre wide Town Planning Scheme (TPS) road.
Environmental safeguards
The applicant has allocated 616.48 square metres (0.15 acres) for a green belt, representing approximately 10% of the total plot area. This space will include the plantation of 135 trees. For storm water management, two percolation wells are planned to recharge ground water. Solid waste will be segregated at the source, with biodegradable waste treated in an on-site Organic Waste Converter (OWC).
Fire safety provisions include an underground fire water tank of 2,00,000 litres and an overhead tank of 60,000 litres. The buildings will be equipped with wet risers, automatic sprinklers in the basement and high-rise areas, and manually operated electric fire alarm systems.
Corporate Environmental Responsibility (CER)
The environmental clearance letter specifies a CER fund of ₹1.56 crore (₹156 lakh). Planned activities include the beautification of the Dantaliya village pond, which involves deepening the pond and planting 750 trees. Other initiatives include installing solar street lights and providing infrastructure such as rooftop solar and percolation wells at the Ambapur village primary school and the Tarapur government primary health centre.
Timeline
A geotechnical investigation was conducted in late 2024, involving nine boreholes drilled to a depth of 45 metres. Environmental approval for the initial proposal was granted on 19 September 2025. A subsequent application for expansion was filed in April 2026 and is currently under environmental review.
The Venezia site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 54% of them.
140 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adalaj (Ct), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Venezia — under environmental review, 0 m away
- Atishay Shivalay 4 — environmental approval granted, 50 m away
- Swarnim Greens — environmental approval granted, 150 m away
- Chandarana — environmental approval granted, 250 m away
- Chandarana — environmental approval granted, 250 m away
- The Opus — environmental approval granted, 600 m away
- Adani University Project — environmental approval granted, 850 m away
- Aalaye — under environmental review, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.