The Venezia is a proposed building project in Adalaj (Ct), Gandhinagar, Gujarat. The site covers 1.3 acres. Its stated project cost is ₹77.6 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 2 Nov 2026).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is The Venezia?

The Venezia is a proposed building project in Adalaj (Ct), Gandhinagar, Gujarat. The site covers 1.3 acres.

Who is building it?

The applicant is R M Enterprise.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Adalaj (Ct), Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹77.6 crore and a site of 1.3 acres.

When was it filed?

The application was filed on 8 Apr 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: The Venezia

Project details

StatusUnder environmental review
Status since2 Nov 2026
Application filed8 Apr 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantR M Enterprise
Land area1.3 acres (0.5 ha)
Project cost₹77.6 crore
Village / localityAdalaj (Ct)
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-11319

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 8 Apr 2026 (this page)Under environmental review1.3 acres₹77.6 crore
New project filed 13 Apr 2025Environmental approval granted1.3 acres₹77.6 crore

What the filings say

What is planned

The Venezia is a proposed high-rise residential and commercial expansion project by R M Enterprise. According to the applicant's project reports, the development is planned on a plot of 0.54 hectares (1.33 acres) and will consist of three building blocks with a total of 146 residential units and 15 shops.

The project configuration includes two basements and a ground floor/hollow plinth, with the blocks reaching heights of 18 to 19 floors. The total built-up area is stated as 38,533.55 square metres.

ItemDetail
Total Units146 residential, 15 commercial
Building Blocks3
Tallest Structure2 basements + Ground + 19 floors
Total Built-up Area38,533.55 square metres
FSI Area21,561.95 square metres
Parking Capacity297 cars (9,332.16 square metres)

Layout and design

The site layout includes a central common plot of 685.32 square metres. The three blocks are arranged around this space, with Block A and B forming one section and Block C, D, and E forming another. The ground floor and hollow plinth areas are designated for parking and society common uses, including a society office and meter rooms.

Access to the buildings is provided via a 6.0-metre wide approach road connected to an 18.0-metre wide Town Planning Scheme (TPS) road. The design incorporates two levels of basements for parking, accessible by a 6.0-metre wide ramp with a 1:7 slope.

Land and surroundings

The project is located at Survey No. 256, Final Plot No. 99, within Draft Town Planning Scheme No. 11-B in Adalaj, Gandhinagar. Geotechnical investigations conducted in October 2024 involved drilling nine boreholes to a depth of 45.0 metres. The soil profile consists of yellowish-brown fine-grained clays of low plasticity near the surface, transitioning to clayey silty sand and sandy clays at greater depths. The ground water table was encountered at depths between 18.0 and 18.50 metres.

Water, power and access

During the construction phase, the applicant estimates a water requirement of 17.5 kilolitres per day (KLD), to be met via tankers. For the operation phase, the total water requirement is projected at 217.43 KLD. Of this, 148.75 KLD will be fresh water sourced from the local authority, while 68.68 KLD will be treated wastewater reused for flushing and horticulture.

Power will be sourced from the local grid, with a 125 KVA diesel generator set proposed for backup. The project also plans to generate 60 KW of solar power. Access to the site is provided by the existing 18.0-metre wide TPS road.

Environmental safeguards

The applicant proposes to install an onsite Sewage Treatment Plant (STP) with a capacity of 200 KLD. Treated water will be recycled for secondary uses, and any surplus will be discharged into the municipal sewer line. For solid waste, an organic waste converter will be used to process biodegradable waste into compost, while recyclables will be sold to vendors.

Stormwater management includes two percolation wells for groundwater recharge, with an estimated annual recharge capacity of approximately 2,400 cubic metres. The greenbelt plan covers 616.48 square metres, including the plantation of 135 trees. Fire safety measures include a 3,00,000-litre underground static water storage tank, 20,000-litre terrace tanks for each block, wet risers, and automatic sprinklers in the basement shops.

The Venezia site plan and layout

4 drawings from the project's filings. Sign in free to see them.

The Venezia: Site layout: building blocks, common plot, and internal roads (preview)🔒 Sign in free to see it
Site layout: building blocks, common plot, and internal roads
The Venezia: Location map: project site relative to Narmada Canal and SH-41 (preview)🔒 Sign in free to see it
Location map: project site relative to Narmada Canal and SH-41
The Venezia: Satellite view of the project boundary with coordinates (preview)🔒 Sign in free to see it
Satellite view of the project boundary with coordinates
The Venezia: Bore log data showing soil stratification and water table depth (preview)🔒 Sign in free to see it
Bore log data showing soil stratification and water table depth

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 54% of them.

140 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Adalaj (Ct), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.