Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Ved Skyline

Ved Skyline is an approved residential project in Nikol, Sabarmati, Ahmadabad, Gujarat. It plans 103 units in 3 towers of up to 13 floors on 1 acre. Its stated project cost is ₹63 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 31 Jan 2026).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since31 Jan 2026
Application filed5 Nov 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantBeez Impex LLP
UseResidential
Units103
Towers3
Floors (tallest)13
Basements2
Height43 m
Parking spaces212
Land area1 acres (0.4 ha)
Built-up area20,878 m² (2,24,729 sq ft)
Plot area4,104 m² (44,175 sq ft)
Project cost₹63 crore
Village / localityNikol
Taluk / tehsilSabarmati
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-09335

What the filings say

What is planned

VED SKYLINE is a new commercial and residential project proposed by Beez Impex LLP. The applicant's project report states that the development will be situated on a plot area of 4,103.65 square metres (1.01 acres) with a total built-up area of 20,877.52 square metres.

The project consists of three blocks (A, B, and C) with a maximum height of 13 floors above ground level. The residential component includes 87 units, while the commercial component comprises 16 shops. The building configuration includes two basement levels for parking and services.

Project Components

ItemDetail
Total Plot Area0.41 hectares (1.01 acres)
Total Built-up Area20,877.52 square metres
Total FSI Area11,054.59 square metres
Residential Units87 units
Commercial Units16 shops
Building Height13 Floors
Basements2 Levels
Parking Area6,740.85 square metres

Layout and design

The layout plan indicates that the three blocks are arranged around a central common plot of 410.65 square metres. Block A and Block B are residential wings, while Block C is a mixed-use wing. The ground floor is designed with a hollow plinth for parking and includes specific areas for an electrical sub-station and meter rooms.

Access to the site is provided via a 24.00-metre wide Town Planning Scheme (TPS) road. Internal movement is facilitated by 6.00-metre wide approach roads and ramps leading to the basements. The design incorporates two basement levels: Basement 1 (3,181.05 square metres) and Basement 2 (3,215.25 square metres).

Water, power and access

The total water requirement during the operational phase is estimated at 94 kilolitres per day (KLD). This includes 87 KLD for residential domestic use, 4 KLD for commercial use, and 3 KLD for gardening. The applicant intends to source fresh water (64 KLD) from the Ahmedabad Municipal Corporation (AMC). A Sewage Treatment Plant (STP) with a capacity of 200 KLD is planned to treat domestic wastewater, with treated water reused for flushing and gardening.

Power requirement for the construction phase is 25 kW, rising to approximately 1.0 MW to 1.5 MW during the operational phase, to be sourced from Uttar Gujarat Vij Company Limited (UGVCL). The project includes a 105 kW rooftop solar plant and 45 electric vehicle charging stations.

Environmental safeguards

The applicant proposes a greenbelt area of 580.65 square metres, consisting of 170 square metres of tree-covered area and 410.65 square metres of lawn. This includes the plantation of approximately 130 trees. For rainwater management, two percolation wells with a depth of 10 metres are planned to recharge ground aquifers.

Solid waste management involves segregating waste into dry (125 kg/day) and wet (153 kg/day) categories. Wet waste will be processed in an on-site Organic Waste Converter (OWC) to produce manure for the greenbelt. Fire safety measures include a 1,00,000-litre underground water tank, a 20,000-litre overhead tank, fire hydrants, sprinklers, and fire lifts.

Timeline

The project documents indicate a three-year implementation period for Corporate Environment Responsibility (CER) activities, with a total budget of ₹72 lakh allocated for solar panels in schools, tree plantation, and lake redevelopment in the surrounding area.

Ved Skyline site plan and layout

A drawing from the project's filings. Sign in free to see it.

Ved Skyline: Site layout: building blocks, common plot, roads and parking ramps (preview)🔒 Sign in free to see it
Site layout: building blocks, common plot, roads and parking ramps

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 83% of them.

271 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nikol, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.