What is Developing? Open the mapMap

Under environmental reviewBuildings & townships · Ahmadabad, Gujarat

Satya Pride

Satya Pride is a proposed building project in Nikol, Sabarmati, Ahmadabad, Gujarat. The site covers 1 acre. Its stated project cost is ₹76.8 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 21 Nov 2026).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusUnder environmental review
Status since21 Nov 2026
Application filed31 Dec 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantSatya Infra
Land area1 acres (0.4 ha)
Project cost₹76.8 crore
Village / localityNikol
Taluk / tehsilSabarmati
DistrictAhmadabad
StateGujarat
Location fromSite area on record
Our referenceWID-GJ-09533

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 31 Dec 2025 (this page)Under environmental review1 acre₹76.8 crore
New project filed 24 Jul 2025Withdrawn1 acre₹76.8 crore

What the filings say

What is planned

Satya Infra proposes to develop Satya Pride, a residential and commercial building complex in Nikol, Ahmedabad. According to the applicant's conceptual plan and project report, the development will consist of four blocks (A, B, C, and D) with a maximum height of 13 floors above a hollow plinth and two basement levels.

The project is designed to accommodate 153 residential units and 11 commercial shops. The residential units are planned as 3 BHK and 4 BHK apartments. The total built-up area is 30,647.09 square metres, with a total Floor Space Index (FSI) area of 19,370.84 square metres.

Project Components

ItemDetail
Total Plot Area0.41 hectares (1.01 acres)
Total Built-up Area30,647.09 square metres
Residential Units153
Commercial Shops11
Tallest Building13 Floors + Hollow Plinth
Basements2 Levels
Total Parking Area5,293.88 square metres

Layout and design

The layout features four interconnected blocks arranged around a central common plot. Blocks A and B are positioned towards the front of the site, while Blocks C and D are located at the rear. The ground floor is designated for commercial shops and a hollow plinth for parking.

Vertical circulation is provided by two lifts per block, including designated fire lifts. The two basement levels are primarily allocated for parking. The project includes a 6.00-metre wide internal approach road and a 6.01-metre wide ramp for basement access. A common plot of 443.30 square metres is located within the site boundaries.

Land and surroundings

The project is situated on Final Plot No. 20 (Sub-Plot No. 2) of Town Planning Scheme No. 101 (Nikol) in the Asarwa taluk of Ahmedabad. The site is currently open land within the Ahmedabad Municipal Corporation (AMC) limits. The surrounding area is primarily residential and commercial. The nearest railway station is Sardargram, approximately 3.50 km away, and Ahmedabad Airport is roughly 4.70 km from the site.

Water, power and access

During the operational phase, the total water requirement is estimated at 158 kilolitres per day (KLD). Fresh water of 109 KLD will be sourced from the Ahmedabad Municipal Corporation (AMC). The applicant proposes to use a dual plumbing system where 49 KLD of treated wastewater will be reused for flushing and gardening.

Power requirement for the operation phase is estimated at 1.5 MW, to be sourced from Uttar Gujarat Vij Company Limited (UGVCL). A Diesel Generator (DG) set is planned for emergency backup. Access to the site is provided via a 24.00-metre wide Town Planning Scheme road.

Environmental safeguards

The applicant proposes to install an in-house Sewage Treatment Plant (STP) with a capacity of 90 KLD. Treated water will be recycled for secondary purposes, with any excess discharged into the municipal drainage network. For solid waste, the project will generate approximately 460 kg per day. The applicant plans to use an Organic Waste Converter (OWC) to process biodegradable waste into manure for the greenbelt.

Rainwater harvesting will be managed through two percolation wells designed to recharge ground aquifers. The greenbelt development will cover approximately 628.3 square metres, including 185 square metres of tree cover and 443.30 square metres of lawn. Energy conservation measures include the use of LED lighting for common areas and solar-powered street lights.

Satya Pride site plan and layout

3 drawings from the project's filings. Sign in free to see them.

Satya Pride: Site layout: blocks, common plot, internal roads and basement ramp (preview)🔒 Sign in free to see it
Site layout: blocks, common plot, internal roads and basement ramp
Satya Pride: Location map: project site and surrounding road network (preview)🔒 Sign in free to see it
Location map: project site and surrounding road network
Satya Pride: Technical drawing: structure of proposed percolation well (preview)🔒 Sign in free to see it
Technical drawing: structure of proposed percolation well

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 83% of them.

270 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nikol, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Satya Infra projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.