Quick answers
What is Expansion of Captive Power Plant From 4.8 MW to 6.5 MW?
Expansion of Captive Power Plant From 4.8 MW to 6.5 MW is a withdrawn industrial project in Kareli, Palsana, Surat, Gujarat. The site covers 15.8 acres.
Who is building it?
The applicant is Tulsi Paper Mills Private Limited.
Has it been approved?
No. The application was withdrawn on 3 Oct 2026, so it is no longer under consideration.
Where is it?
In Kareli, Palsana, Surat, Gujarat.
How big is it?
It has a stated cost of ₹1.6 crore and a site of 15.8 acres.
When was it filed?
The application was filed on 3 Oct 2026.
Project details
| Official title | Expansion of Captive Power Plant From 4.8 MW to 6.5 MW Along With Addition of Deinking Process in the Existing Duplex Board Manufacturing Unit by M/S. Tulsi Paper Mills PVT. LTD. at Block No. 356 to 359 of Village: Dastan, Block No. 38/B of Village: Kareli, Taluka: Palsana, Dist: Surat, Gujarat – 394310 |
|---|---|
| Status | Withdrawn |
| Status since | 3 Oct 2026 |
| Application filed | 3 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Tulsi Paper Mills Private Limited |
| Land area | 15.8 acres (6.4 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Kareli |
| Taluk / tehsil | Palsana |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11235 |
In context
103 applications in Surat since January 2022 are in the same category (Industry): 59 approved, 29 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 15.8 acres, this one is larger than 65% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kareli, Palsana, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement of Captive Power Plant Capacity and Duplex Board Manufacturing… — under environmental review, 0 m away
- Laying of 66 KV Under ground cable line from Exi.220 KV Mota SS to Exi. 66 KV… — lapsed, 3 km away
- Proposed expansion of Stand Alone Cement Manufacturing (Clinker Grinding) Unit… — environmental approval granted, 3.4 km away
- Proposed expansion of Stand Alone Cement Manufacturing (Clinker Grinding) Unit… — environmental approval granted, 3.4 km away
- The proposed production of synthetic organic chemicals manufacturing unit… — environmental approval granted, 4.5 km away
- The proposed production of synthetic organic chemicals manufacturing unit… — cleared for impact study, 4.5 km away
- Forest Land 0.3346hac. for Forest Clearance for Laying of 220KV Under Ground… — forest land use approved, 5.4 km away
- Proposed Capacity Expansion of Sugar Manufacturing Unit due to Modernization… — environmental approval granted, 5.6 km away
More from Tulsi Paper Mills Private Limited in Surat
- Enhancement of Captive Power Plant Capacity and Duplex Board Manufacturing… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.