What is Developing? Open the mapMap

Under environmental reviewIndustry · Surat, Gujarat

Enhancement of Captive Power Plant Capacity and Duplex Board Manufacturing Capacity by M/S. Tulsi Paper Mills PVT. LTD

Enhancement of Captive Power Plant Capacity and Duplex Board Manufacturing Capacity by M/S. Tulsi Paper Mills PVT. LTD is a proposed industrial project in Kareli, Palsana, Surat, Gujarat. The site covers 15.8 acres. Its stated project cost is ₹155.9 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 2 Nov 2026).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Enhancement of Captive Power Plant Capacity and Duplex Board Manufacturing Capacity by M/S. Tulsi Paper Mills PVT. LTD is a proposed industrial project in Kareli, Palsana, Surat, Gujarat. The site covers 15.8 acres.

Who is building it?

The applicant is Tulsi Paper Mills Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Kareli, Palsana, Surat, Gujarat.

How big is it?

It has a stated cost of ₹155.9 crore and a site of 15.8 acres.

When was it filed?

The application was filed on 2 Nov 2026.

Project details

Official titleEnhancement of Captive Power Plant Capacity and Duplex Board Manufacturing Capacity Along With Addition of Deinking Process in the Duplex Board Manufacturing Unit by M/S. Tulsi Paper Mills PVT. LTD.
StatusUnder environmental review
Status since2 Nov 2026
Application filed2 Nov 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantTulsi Paper Mills Private Limited
Land area15.8 acres (6.4 ha)
Project cost₹155.9 crore
Village / localityKareli
Taluk / tehsilPalsana
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-15051

In context

103 applications in Surat since January 2022 are in the same category (Industry): 59 approved, 29 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 15.8 acres, this one is larger than 65% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kareli, Palsana, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Tulsi Paper Mills Private Limited in Surat

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.