Quick answers
What is this project?
The proposed production of synthetic organic chemicals manufacturing unit having capacity of 1500.00 MT/Month at Survey/ Block No.: 1380, Vill.: Mota, Tal.: Bardoli, Dist.: Surat, Gujarat – 394345 by M/s. Om Tex Flochem LLP is an approved industrial project in Mota, Bardoli, Surat, Gujarat. The site covers 3 acres.
Who is building it?
The applicant is Om Tex Flochem LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 May 2025), as of 27 Nov 2026.
Where is it?
In Mota, Bardoli, Surat, Gujarat.
How big is it?
It has a stated cost of ₹4.2 crore and a site of 3 acres.
When was it filed?
The application was filed on 31 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 May 2025 |
| Application filed | 31 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Om Tex Flochem LLP |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹4.2 crore |
| Village / locality | Mota |
| Taluk / tehsil | Bardoli |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08445 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Jan 2025 (this page) | Environmental approval granted | 3 acres | ₹4.2 crore |
| Early planning filed 13 Apr 2024 | Cleared for impact study | 3 acres | ₹4.2 crore |
In context
103 applications in Surat since January 2022 are in the same category (Industry): 59 approved, 29 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3 acres, this one is larger than 50% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mota, Bardoli, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The proposed production of synthetic organic chemicals manufacturing unit… — cleared for impact study, 0 m away
- Forest Land 0.3346hac. for Forest Clearance for Laying of 220KV Under Ground… — forest land use approved, 2 km away
- Laying of 66 KV Under ground cable line from Exi.220 KV Mota SS to Exi. 66 KV… — lapsed, 2.5 km away
- Diversion of Protected Forest Land for Widening to connect proposed bridge on… — lapsed, 3.7 km away
- Enhancement of Captive Power Plant Capacity and Duplex Board Manufacturing… — under environmental review, 4.5 km away
- Expansion of Captive Power Plant From 4.8 MW to 6.5 MW — withdrawn, 4.5 km away
- Diversion of 0.9801 Ha Forest Land for Construction of Earthen to Blacktop… — forest land use approved, 5.6 km away
- Proposed industrial shed of M/s. Celloraa Energy Private Limited for… — initial checks, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.