Project details
| Official title | Proposed industrial shed for manufacturing of Electrical Cables and Wires at Village: Memar, Taluka: Bavla, District: Ahmedabad 382230 |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 May 2026 |
| Application filed | 12 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Torrent Electricals limited |
| Use | Industrial |
| Towers | 15 |
| Floors (tallest) | 15 |
| Basements | 1 |
| Parking spaces | 483 |
| Land area | 63.8 acres (25.8 ha) |
| Built-up area | 1,31,829 m² (14,18,994 sq ft) |
| Plot area | 2,58,175 m² (27,78,970 sq ft) |
| Project cost | ₹1,047 crore |
| Village / locality | Memar |
| Taluk / tehsil | Bavla |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11712 |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 63.8 acres, this one is larger than 95% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Memar, Bavla, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Increase of Premises Area and Reconfirmation of Built-Up of the Industrial… — initial checks, 200 m away
- Sattva Valley — more information requested, 1.6 km away
- Bholad-Ahmedabad Rural Pipeline Connectivity — forest land use approved, 5.3 km away
- Proposed project of Bulk Drugs (API, API Intermediate, Preservatives)… — cleared for impact study, 7.6 km away
- Proposed project of Bulk Drugs (API, API Intermediate, Preservatives)… — cleared for impact study, 7.6 km away
- Telecom Network in Fedra – Bagodara Road - SH-01 Diversion of 0.913 ha. of… — forest land use approved, 8.1 km away
- Proposed Expansion of Existing Grain Based Distillery From 100 Klpd to 350… — initial checks, 8.4 km away
- Proposed Expansion of Existing Grain Based Distillery From 100 Klpd to 350… — environmental approval granted, 8.4 km away
More from Torrent Electricals limited in Ahmadabad
All 3 Torrent Electricals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.