Project details
| Status | More information requested |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 5 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sattva Valley Buildcon LLP |
| Land area | 7.7 acres (3.1 ha) |
| Project cost | ₹45.5 crore |
| Village / locality | Memar |
| Taluk / tehsil | Bavla |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15094 |
What the filings say
What is planned
Sattva Valley Buildcon LLP proposes a mixed-use residential and commercial construction project in Memar, Bavla. The project is planned on a plot of 3.11 hectares (7.69 acres) and consists of 13 blocks in total.
The residential component comprises 12 buildings (Blocks 1A to 1L), each designed with a ground floor and three upper floors. These blocks will house a total of 384 residential units. The commercial component consists of one building (Block B) with a ground floor and four upper floors. This block is designed to accommodate offices and a restaurant.
Project Components and Areas
| Item | Detail |
|---|---|
| Total Plot Area | 31,133 sq. mt. |
| Commercial Plot Area | 5,038.83 sq. mt. |
| Residential Plot Area | 26,094.17 sq. mt. |
| Total Residential Units | 384 |
| Residential Floors | G + 3 |
| Commercial Floors | G + 4 |
| Total Residential FSI Area | 34,727.04 sq. mt. |
| Total Commercial FSI Area | 5,554.00 sq. mt. |
Layout and design
The site layout features the commercial Block B positioned at the front of the plot, adjacent to a 12.00-metre wide crossover road. The 12 residential blocks are arranged in two rows behind the commercial building, separated by internal 9.00-metre wide roads.
Four common plots are distributed across the site for open space. Common Plot 1 is located near the commercial block, while Common Plots 2, 3, and 4 are integrated within the residential clusters. The design includes a total of 2,794.70 sq. mt. of common plot area.
Water, power and access
During the construction phase, water will be sourced from local tankers. For the operation phase, the applicant intends to obtain water from the local body. Domestic sewage will be managed through a septic tank and soak pit system during construction, and later connected to the local body's drainage line once operational.
Storm water will be managed through a dedicated internal drainage system and diverted to the local body's storm water lines. The project includes nine percolating wells for rainwater harvesting—two for the commercial area and seven for the residential area.
Access to the site is provided via an 18.00-metre wide road. Internal circulation is managed through 12.00-metre and 9.00-metre wide roads. Parking is planned according to National Building Code (NBC) and Gujarat Development Control Regulations (GDCR) norms, with separate provisions for residential and commercial users.
Environmental safeguards
The applicant's Environmental Management Plan (EMP) includes several mitigation measures:
- Air Quality: Regular water sprinkling and tarpaulin covers for construction materials to control dust. Vehicles must have valid Pollution Under Control (PUC) certificates.
- Noise Control: Acoustic enclosures for Diesel Generator (DG) sets and periodic maintenance of machinery.
- Waste Management: Segregation of municipal solid waste into dry and wet categories. Wet waste will be processed in an organic waste composter for use in greenbelt development.
- Energy Conservation: Use of LED lighting in common areas, solar lights for open sunlit areas, and energy-efficient motors and pumps.
- Greenbelt: Development of a greenbelt area within and around the premises, with a plan to plant approximately 782 trees (128 in the commercial area and 654 in the residential area).
- Safety: Installation of fire extinguishers, hydrants, sprinklers, and manual fire alarms as per NBC 2005 standards. A lightning arrester and emergency power backup will also be provided.
Sattva Valley site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.7 acres, this one is larger than 90% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Memar, Bavla, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Increase of Premises Area and Reconfirmation of Built-Up of the Industrial… — initial checks, 1.6 km away
- Proposed industrial shed for manufacturing of Electrical Cables and Wires — environmental approval granted, 1.6 km away
- Bholad-Ahmedabad Rural Pipeline Connectivity — forest land use approved, 6.9 km away
- Proposed Expansion of Existing Grain Based Distillery From 100 Klpd to 350… — initial checks, 7.3 km away
- Proposed Expansion of Existing Grain Based Distillery From 100 Klpd to 350… — environmental approval granted, 7.3 km away
- Proposed project of Bulk Drugs (API, API Intermediate, Preservatives)… — cleared for impact study, 7.5 km away
- Proposed project of Bulk Drugs (API, API Intermediate, Preservatives)… — cleared for impact study, 7.5 km away
- Telecom Network in Fedra – Bagodara Road - SH-01 Diversion of 0.913 ha. of… — forest land use approved, 8.4 km away
All 39 Salarpuria Sattva Group projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.