Quick answers
What is 72.45MW Wind Project - Kite?
72.45MW Wind Project - Kite is an approved power project in Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat. The site covers 9.6 acres.
Who is building it?
The applicant is Juniper Green Kite Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 10 Sept 2026), as of 27 Nov 2026.
Where is it?
In Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹75 lakh; a site of 9.6 acres and 2.1 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 16 Jul 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 72.45MW Wind Project - Kite
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 10 Sept 2026 |
| Application filed | 16 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Juniper Green Kite Private Limited |
| Land area | 9.6 acres (3.9 ha) |
| Forest land | 2.1 acres (0.9 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Kuranga |
| Taluk / tehsil | Okhamandal |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12136 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Jul 2025 (this page) | Forest land use approved | 9.6 acres | ₹75 lakh |
| New project filed 24 Nov 2024 | Lapsed | ₹75 lakh |
In context
21 applications in Devbhumi Dwarka since January 2022 are in the same category (Power): 4 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected. At 9.6 acres, this one is larger than 83% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 72.45MW Wind Project - Kite — lapsed, 350 m away
- Permission for Laying Ug Drinking Water Pipeline in Various Forest Land and Pf… — forest land use approved, 1.6 km away
- Approach Road for WTG Location — under forest review, 1.9 km away
- Approach road for store (Kuranga Village) — forest land use approved, 2 km away
- 33KV UG Line at Village Kuranga — lapsed, 2.1 km away
- Approach Road for WTG Location — more information requested, 2.4 km away
- Approach Road to Farm — more information requested, 2.5 km away
- Diversion of 2.01 Ha of Forest Land for Transportation of Men & Materials and… — initial checks, 2.6 km away
About this information