Quick answers
What is 72.45MW Wind Project - Kite?
72.45MW Wind Project - Kite is a lapsed power project in Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat. It seeks 1.2 acres of forest land.
Who is building it?
The applicant is Juniper Green Kite Private Limited.
Has it been approved?
No. The application was lapsed on 11 Apr 2025, so it is no longer under consideration.
Where is it?
In Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹75 lakh and 1.2 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 24 Nov 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Apr 2025 |
| Application filed | 24 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Juniper Green Kite Private Limited |
| Forest land | 1.2 acres (0.5 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Kuranga |
| Taluk / tehsil | Okhamandal |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12863 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Jul 2025 | Forest land use approved | 9.6 acres | ₹75 lakh |
| New project filed 24 Nov 2024 (this page) | Lapsed | ₹75 lakh |
In context
21 applications in Devbhumi Dwarka since January 2022 are in the same category (Power): 4 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 72.45MW Wind Project - Kite — forest land use approved, 350 m away
- Permission for Laying Ug Drinking Water Pipeline in Various Forest Land and Pf… — forest land use approved, 1.3 km away
- Approach road for store (Kuranga Village) — forest land use approved, 1.6 km away
- Approach Road for WTG Location — under forest review, 2.2 km away
- Diversion of 2.01 Ha of Forest Land for Transportation of Men & Materials and… — initial checks, 2.2 km away
- 33KV UG Line at Village Kuranga — lapsed, 2.4 km away
- Approach Road for WTG Location — more information requested, 2.7 km away
- Gandhvi to Gorinja UG Drinking water pipeline — lapsed, 2.8 km away