Quick answers
What is Approach Road for WTG Location?
Approach Road for WTG Location is a proposed road project in Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat. The site covers 2.2 acres.
Who is building it?
The applicant is Torrent Saurya Urja 2 Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹13 lakh; a site of 2.2 acres and 2.2 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 28 Oct 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 28 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Torrent Saurya Urja 2 Private Limited |
| Land area | 2.2 acres (0.9 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹13 lakh |
| Village / locality | Kuranga |
| Taluk / tehsil | Okhamandal |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14129 |
In context
12 applications in Devbhumi Dwarka since January 2022 are in the same category (Roads & highways): 2 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. At 2.2 acres, this one is larger than 73% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kuranga, Okhamandal, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33KV UG Line at Village Kuranga — lapsed, 400 m away
- Approach Road for WTG Location — under forest review, 550 m away
- Approach Road to Farm — more information requested, 750 m away
- Approach Road to Farm — more information requested, 1.4 km away
- 72.45MW Wind Project - Kite — forest land use approved, 2.4 km away
- 72.45MW Wind Project - Kite — lapsed, 2.7 km away
- Captive Jetty with Throughput of 3.2 MMTPA for RSPL Soda Ash Plant — cleared for impact study, 3.7 km away
- Permission for Laying Ug Drinking Water Pipeline in Various Forest Land and Pf… — forest land use approved, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.