What is Developing? Open the mapMap

LapsedRoads & highways · Aravalli, Gujarat

Widening and Straightening of existing Road Dabha to Zanzari Road Taluka Bayad District Arvalli

Widening and Straightening of existing Road Dabha to Zanzari Road Taluka Bayad District Arvalli is a lapsed road project in Bhajpur, Bayad, Aravalli, Gujarat. The site covers 4 acres. Its stated project cost is ₹12.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 10 Apr 2026).

See it on the live map All projects in Aravalli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Widening and Straightening of existing Road Dabha to Zanzari Road Taluka Bayad District Arvalli is a lapsed road project in Bhajpur, Bayad, Aravalli, Gujarat. The site covers 4 acres.

Who is building it?

The applicant is Executive Engineer.

Has it been approved?

No. The application was lapsed on 10 Apr 2026, so it is no longer under consideration.

Where is it?

In Bhajpur, Bayad, Aravalli, Gujarat.

How big is it?

It has a stated cost of ₹12.5 crore; a site of 4 acres and 4 acres (1.6 ha) of forest land.

When was it filed?

The application was filed on 2 Jan 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Widening and Straightening of existing Road Dabha to Zanzari Road Taluka Bayad District…

Project details

Official titleWidening and Straightening of existing Road Dabha to Zanzari Road in Reserve forest land Taluka Bayad District Arvalli.
StatusLapsed
Status since10 Apr 2026
Application filed2 Jan 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantExecutive Engineer
Land area4 acres (1.6 ha)
Forest land4 acres (1.6 ha)
Project cost₹12.5 crore
Village / localityBhajpur
Taluk / tehsilBayad
DistrictAravalli
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12446

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 1 Mar 2026Lapsed11.4 acres₹12.5 crore
New project filed 2 Jan 2026 (this page)Lapsed4 acres₹12.5 crore

In context

14 applications in Aravalli since January 2022 are in the same category (Roads & highways): 2 approved, 8 filed or under review, and 4 withdrawn, lapsed or rejected. At 4 acres, this one is smaller than 58% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhajpur, Bayad, Aravalli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Executive Engineer in Aravalli

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.