Quick answers
What is this project?
Diversion of 0.8676 ha forest land for 66kV LILO Gorakhadi line from 66kV Gorakhadi substation GETCO to LILO Point of Existing 66kv Dhrafa Sethvadala line is a lapsed power project in Gorkhadi, Jamjodhpur, Jamnagar, Gujarat. The site covers 2.1 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
No. The application was lapsed on 12 May 2026, so it is no longer under consideration.
Where is it?
In Gorkhadi, Jamjodhpur, Jamnagar, Gujarat.
How big is it?
It has a stated cost of ₹9 crore; a site of 2.1 acres and 2.1 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 11 May 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 May 2026 |
| Application filed | 11 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 2.1 acres (0.9 ha) |
| Forest land | 2.1 acres (0.9 ha) |
| Project cost | ₹9 crore |
| Village / locality | Gorkhadi |
| Taluk / tehsil | Jamjodhpur |
| District | Jamnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12308 |
In context
30 applications in Jamnagar since January 2022 are in the same category (Power): 9 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 2.1 acres, this one is larger than 59% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gorkhadi, Jamjodhpur, Jamnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 1.3573 ha forest land for erection of 66kV LILO Gorakhadi Line… — more information requested, 700 m away
- 11KV Lines From Gorkhadi Substation to Existing Line — lapsed, 700 m away
- Divyarajsinh J Jadeja (Dhrafa Black Trap Quarry Area), Area- 1.6229 Ha — under environmental review, 4.5 km away
- Diversion of Reserve Forest Land for construction of Moti-Bharad to Bhardaki… — initial checks, 5.2 km away
- (1) Chorbedi Bhijabedi Road (2) Butwadar Sang Chiroda Moti Bharad Kalyanpur… — more information requested, 6.5 km away
- Shri Viram Maldebhai Ambaliya (Re-Appraisal) Lease Area-1.00.00Ha. Vill: Sheth… — environmental approval granted, 6.9 km away
- Shri Karanabhai M Ambaliya — initial checks, 6.9 km away
- Shri Karanabhai M Ambaliya — cleared for impact study, 6.9 km away
More from Gujarat Energy Transmission Corp LTD in Jamnagar
- Diversion of 0.15156 ha Reserved Forest land for Laying of 66kV Underground… — initial checks
- diversion of 0.1739-hectare forest land for Laying of 66KV S/C Rampar-Stena… — more information requested
- Diversion of 1.3573 ha forest land for erection of 66kV LILO Gorakhadi Line… — more information requested
- 66KV S/C Line From 66KV Jayva (Getco) S/S to Switchyard of M/S Aluwerk LLP… — forest land use approved
- 66KV S/C line from 66KV Jayva(GETCO) Substation to switchyard of M/S RAVI… — forest land use approved
- Diversion of 0.09037 Ha Forest land for 66KV S/C Jamnagar Suvarda Liine with… — lapsed
17 Gujarat Energy Transmission Corp projects in Jamnagar
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.