Quick answers
What is this project?
Diversion of 0.15156 ha Reserved Forest land for Laying of 66kV Underground Cable line from 66kV Satapar Substation to Existing Tower Location of 66KV D/C Jasapar-Satapar line with 66KV, 1Cx630sq.mm XLPE Power Cable (6+1) near village: - Satapar Tal. Jamjodhpur & Dist.Jamnagar is a proposed power project in Satapar, Jamjodhpur, Jamnagar, Gujarat. The site covers 0.4 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Satapar, Jamjodhpur, Jamnagar, Gujarat.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 0.4 acres and 1,520 m² of forest land.
When was it filed?
The application was filed on 18 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 18 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 1,500 m² |
| Forest land | 1,520 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Satapar |
| Taluk / tehsil | Jamjodhpur |
| District | Jamnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15159 |
In context
30 applications in Jamnagar since January 2022 are in the same category (Power): 9 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.4 acres, this one is smaller than 74% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Satapar, Jamjodhpur, Jamnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Normal Forest Land for laying 40mm dia. HDEP Pipe along Katkola… — forest land use approved, 1.6 km away
- Upgradation of Jamjodhpur Group as per 100 LPCD, Ta. - Jamjodhpur,… — lapsed, 3.3 km away
- Upgradation of Lalpur Group As Per 100 Lpcd — lapsed, 3.3 km away
- Diversion of Forest Land for "improvement and Up -Gradation of Newly Declared… — more information requested, 12.7 km away
- Patan Building Limestone Block-3 — environmental approval granted, 13.1 km away
- Patan Building Limestone Block-3 — cleared for impact study, 13.1 km away
- Proposed Shri Dineshbhai Vitthalbhai Patel, Patan Building Limestone… — environmental approval granted, 13.5 km away
- M/s Shri Dineshbhai Vitthalbhai Patel Patan Building Limestone Quarry QL1 (4… — environmental approval granted, 13.5 km away
More from Gujarat Energy Transmission Corp LTD in Jamnagar
- diversion of 0.1739-hectare forest land for Laying of 66KV S/C Rampar-Stena… — more information requested
- Diversion of 1.3573 ha forest land for erection of 66kV LILO Gorakhadi Line… — more information requested
- Diversion of 0.8676 ha forest land for 66kV LILO Gorakhadi line from 66kV… — lapsed
- 66KV S/C Line From 66KV Jayva (Getco) S/S to Switchyard of M/S Aluwerk LLP… — forest land use approved
- 66KV S/C line from 66KV Jayva(GETCO) Substation to switchyard of M/S RAVI… — forest land use approved
- Diversion of 0.09037 Ha Forest land for 66KV S/C Jamnagar Suvarda Liine with… — lapsed
17 Gujarat Energy Transmission Corp projects in Jamnagar
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.