Quick answers
What is this project?
66KV S/C line from 66KV Jayva(GETCO) Substation to switchyard of M/S RAVI TECHNOFORGE PVT LTD is an approved power project in Jayva, Dhrol, Jamnagar, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 14 Apr 2026), as of 27 Nov 2026.
Where is it?
In Jayva, Dhrol, Jamnagar, Gujarat.
How big is it?
It has a stated cost of ₹3.4 crore; a site of 0.3 acres and 950 m² of forest land.
When was it filed?
The application was filed on 1 Mar 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 14 Apr 2026 |
| Application filed | 1 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 1,400 m² |
| Forest land | 950 m² |
| Project cost | ₹3.4 crore |
| Village / locality | Jayva |
| Taluk / tehsil | Dhrol |
| District | Jamnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13247 |
In context
30 applications in Jamnagar since January 2022 are in the same category (Power): 9 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.3 acres, this one is smaller than 93% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jayva, Dhrol, Jamnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 66KV S/C Line From 66KV Jayva (Getco) S/S to Switchyard of M/S Aluwerk LLP… — forest land use approved, 1 km away
- Proposed Synthetic Organic Chemicals Manufacturing unit of M/s. Advait… — environmental approval granted, 6.8 km away
- Proposed Synthetic Organic Chemicals Manufacturing unit of M/s. Advait… — cleared for impact study, 6.8 km away
- Laying of 66KV S/C Dhrol – Jayva underground cable line with 66KV, 1Cx630sq.mm… — forest land use approved, 8.2 km away
- 4-laning of Dhrol Section of NH-151A in State of Gujarat — not approved, 10.3 km away
- Laying UG OFC Line in Dhrol Taluka of Jamnagar Dist — more information requested, 10.3 km away
- 4-laning of Dhrol Section of NH-151A in State of Gujarat — forest land use approved, 10.4 km away
- 4-laning of Dhrol Section of NH-151A in State of Gujarat — forest land use approved, 10.4 km away
More from Gujarat Energy Transmission Corp LTD in Jamnagar
- Diversion of 0.15156 ha Reserved Forest land for Laying of 66kV Underground… — initial checks
- diversion of 0.1739-hectare forest land for Laying of 66KV S/C Rampar-Stena… — more information requested
- Diversion of 1.3573 ha forest land for erection of 66kV LILO Gorakhadi Line… — more information requested
- Diversion of 0.8676 ha forest land for 66kV LILO Gorakhadi line from 66kV… — lapsed
- 66KV S/C Line From 66KV Jayva (Getco) S/S to Switchyard of M/S Aluwerk LLP… — forest land use approved
- Diversion of 0.09037 Ha Forest land for 66KV S/C Jamnagar Suvarda Liine with… — lapsed
17 Gujarat Energy Transmission Corp projects in Jamnagar
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.