Quick answers
What is this project?
Diversion of 0.538 Hectors. Reserved Forest Land for the Grant Permission for Laying Optical Fibre Cable With Protection Pipes Along the Roads Under 4g Mobile Saturation Project, a Project of Government of India Funded Through the Universal Service Obligation (Uso) Fund Connecting 4g Mobile Tower With Ofc in Tapi Distict, Gujarat. Uso Sites Pertains to Fort Songadh, Dolvan, Uchhal Talukas, Dist. Tapi in Gujarat State is an approved telecom project in Nindvada, Songadh, Tapi, Gujarat. The site covers 1.8 acres.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 18 Nov 2024), as of 27 Nov 2026.
Where is it?
In Nindvada, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹50 lakh; a site of 1.8 acres and 1.3 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 15 Dec 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 18 Nov 2024 |
| Application filed | 15 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 1.8 acres (0.7 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Nindvada |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12323 |
In context
24 applications in Tapi since January 2022 are in the same category (Telecom): 9 approved, 4 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1.8 acres, this one is larger than 62% of them.
Where it is
Nindvada, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tapi 4G Sat USOF — forest land use approved, 6.7 km away
- Tapi 4G Sat USO — lapsed, 6.7 km away
- Laying of 66kV 630 sq mm (3+1) XLPE Underground cable for 66KV Ukai - Bhimpura… — forest land use approved, 8.1 km away
- Laying of 66kV 630 sq mm (3+1) XLPE Underground cable for 66KV Ukai - Satkashi… — forest land use approved, 8.9 km away
- Laying OFC for 4G coverage of uncovered villages through USOF, Babarghat T… — lapsed, 9.1 km away
- Line erection work of 66KV Ukai SS to 66kV Satkashi pumping station-1,2 & 3 of… — lapsed, 9.8 km away
- Widening and Strengthening of Songadh Ukai Sherulla Road (KM 2/800 to 18/500)… — more information requested, 9.9 km away
- Tapi 4G Sat USOF VVIP Cases — forest land use approved, 10 km away
More from Bharat Sanchar Nigam Limited in Tapi
- Tapi 4G Sat USOF — forest land use approved
- Tapi 4G Sat USO — lapsed
4 Bharat Sanchar Nigam (BSNL) projects in Tapi
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.