Quick answers
What is Tapi 4G Sat USOF?
Tapi 4G Sat USOF is an approved telecom project in Kuilivel, Songadh, Tapi, Gujarat. The site covers 0.6 acres.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 11 Oct 2023), as of 27 Nov 2026.
Where is it?
In Kuilivel, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹16 crore; a site of 0.6 acres and 2,400 m² of forest land.
When was it filed?
The application was filed on 21 Feb 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 11 Oct 2023 |
| Application filed | 21 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 2,400 m² |
| Forest land | 2,400 m² |
| Project cost | ₹16 crore |
| Village / locality | Kuilivel |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13855 |
In context
24 applications in Tapi since January 2022 are in the same category (Telecom): 9 approved, 4 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.6 acres, this one is smaller than 67% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kuilivel, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tapi 4G Sat USO — lapsed, 0 m away
- Laying OFC for 4G coverage of uncovered villages through USOF, Babarghat T… — lapsed, 2.5 km away
- Juni Bavli Pumped Storage Hydro Electric Project (450 MW) — cleared for impact study, 4.3 km away
- Line erection work of 66KV Ukai SS to 66kV Satkashi pumping station-1,2 & 3 of… — lapsed, 5.3 km away
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — lapsed, 6.3 km away
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — lapsed, 6.3 km away
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — cleared for impact study, 6.6 km away
- Diversion of 0.538 Hectors. Reserved Forest Land for the Grant Permission for… — forest land use approved, 6.7 km away
More from Bharat Sanchar Nigam Limited in Tapi
- Diversion of 0.538 Hectors. Reserved Forest Land for the Grant Permission for… — forest land use approved
- Tapi 4G Sat USO — lapsed
4 Bharat Sanchar Nigam (BSNL) projects in Tapi
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.