Quick answers
What is this project?
Laying OFC for 4G coverage of uncovered villages through USOF, Babarghat T joint to Nurabad USO site, Budhwada USO to Junikuilivel USO, GFGNL T Joint Golan to Golan USO site.Lakhigam GP to Rakhaskhadi USO, & Selud GP to Nanchal USO site is a lapsed telecom project in Babarghat, Uchchhal, Tapi, Gujarat. The site covers 1.5 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 30 Apr 2026, so it is no longer under consideration.
Where is it?
In Babarghat, Uchchhal, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹1 crore; a site of 1.5 acres and 1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 3 Apr 2023.
Project details
| Official title | Proposal for laying OFC for 4G coverage of uncovered villages through USOF, Babarghat T joint to Nurabad USO site, Budhwada USO to Junikuilivel USO, GFGNL T Joint Golan to Golan USO site.Lakhigam GP to Rakhaskhadi USO, & Selud GP to Nanchal USO site |
|---|---|
| Status | Lapsed |
| Status since | 30 Apr 2026 |
| Application filed | 3 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 1 acres (0.4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Babarghat |
| Taluk / tehsil | Uchchhal |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14222 |
In context
24 applications in Tapi since January 2022 are in the same category (Telecom): 9 approved, 4 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1.5 acres, this one is smaller than 57% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Babarghat, Uchchhal, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Juni Bavli Pumped Storage Hydro Electric Project (450 MW) — cleared for impact study, 2.2 km away
- Tapi 4G Sat USOF — forest land use approved, 2.5 km away
- Tapi 4G Sat USO — lapsed, 2.5 km away
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — lapsed, 4.1 km away
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — lapsed, 4.1 km away
- Line erection work of 66KV Ukai SS to 66kV Satkashi pumping station-1,2 & 3 of… — lapsed, 4.2 km away
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — cleared for impact study, 4.6 km away
- Satkashi Pumped Storage Hydro Electric Project (330 MW) — cleared for impact study, 6.2 km away
More from Mahesh Nair in Tapi
- Diversion of 0.00135 Hectors Reserved Forest Land for the Grant of Permission… — forest land use approved
- Tapi 4G Saturation Khogal Gam village — forest land use approved
- Tapi 4G Sat VVIP 3 — forest land use approved
- Tapi 4G Sat VVIP2 — forest land use approved
- Tapi 4G Sat USOF VVIP Cases — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.