Quick answers
What is this project?
Diversion of forest area of Vira Village, Ta: Anjar, Dist: Kutch for construction of 66 KV Overhead Rampar-Bhadreshwar D/C Line is a proposed power project in Vira, Anjar, Kachchh, Gujarat. The site covers 77.7 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Vira, Anjar, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 77.7 acres and 5 acres (2 ha) of forest land.
When was it filed?
The application was filed on 30 Jul 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 30 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 77.7 acres (31.4 ha) |
| Forest land | 5 acres (2 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Vira |
| Taluk / tehsil | Anjar |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12333 |
In context
75 applications in Kachchh since January 2022 are in the same category (Power): 30 approved, 30 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 77.7 acres, this one is larger than 70% of them.
Where it is
Vira, Anjar, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fibre Pvt. Ltd. Laying Of OFC Line District Kutch Village Mathak,… — forest land use approved, 5.6 km away
- Coastal Regulation Zone Clearance of proposed Salt Pan of M/s. Patel Salt &… — recommended by coastal authority, 5.9 km away
- CRZ Clearance for Proposed Salt Pan of M/s. Daivya Salt And Chemicals Pvt.… — recommended by coastal authority, 6.6 km away
- Underground LPG Pipeline at Adani Ports & Special Economic Zone Limited… — more information requested, 6.7 km away
- CRZ Clearance for Salt Pan of M/s. Aashwat Salt & Chemicals Pvt. Ltd., at Plot… — recommended by coastal authority, 7.8 km away
- Industrial project by M/s. Anmol Polymers Private Limited — environmental approval granted, 8.3 km away
- Industrial project by M/s. Anmol Polymers Private Limited — cleared for impact study, 8.3 km away
- CRZ Clearance for the Proposed Salt Pan of M/s Shamji Kangad & Co. at Plot no.… — recommended by coastal authority, 8.4 km away
More from Gujarat Energy Transmission Corp LTD in Kachchh
- Clearance of land In Wild Ass Sanctuary (Raising/Shifting of Existing 220 KV… — under wildlife review
- 66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar… — more information requested
- Permission for Diversion of 0.1001 Ha Forest land of Karmata Village, Ta:… — more information requested
- Diversion of 13.11 Ha Reserve forest land for 400kV D/C Bhachunda - Varsana… — under forest review
- Permission for Diversion of 0.4106 Ha Roadside Protected Forest land of… — more information requested
- 220 KV Gadhsisha lilo line from 220 KV Nakhatrana-Nanikhakhar line (Diversion… — forest land use approved
43 Gujarat Energy Transmission Corp projects in Kachchh
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.