Quick answers
What is this project?
Diversion of 13.11 Ha Reserve forest land for 400kV D/C Bhachunda - Varsana Transmission Line is a proposed power project in Bhachunda, Abdasa, Kachchh, Gujarat. The site covers 32.4 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Bhachunda, Abdasa, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹15 lakh; a site of 32.4 acres and 32.4 acres (13.1 ha) of forest land.
When was it filed?
The application was filed on 28 Jun 2026.
Project details
| Official title | Proposal for diversion of 13.11 Ha Reserve forest land for 400kV D/C Bhachunda - Varsana Transmission Line |
|---|---|
| Status | Under forest review |
| Status since | 19 Nov 2026 |
| Application filed | 28 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 32.4 acres (13.1 ha) |
| Forest land | 32.4 acres (13.1 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Bhachunda |
| Taluk / tehsil | Abdasa |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13051 |
In context
75 applications in Kachchh since January 2022 are in the same category (Power): 30 approved, 30 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 32.4 acres, this one is larger than 57% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhachunda, Abdasa, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest Land for widening on Deshalpar – Nalia Road… — lapsed, 2.9 km away
- Laying of Underground Drinking Water Pipeline Through the Roadside Protected… — more information requested, 3.6 km away
- Diversion of 0.3795 Ha Protected Forest Land for Laying of Proposed… — lapsed, 4 km away
- Diversion of Protected Forest Land for the Laying of Underground Water Pipeline — forest land use approved, 4 km away
- Diversion of Road-Side Protected Forest Land of Mothada-Kothara Road for Lying… — forest land use approved, 5.8 km away
- Shri Swati Minerals. Area-2.57.99 Pvt. Land & Survey No.- 125 Paiki QL No- 17767 — cleared for impact study, 7.9 km away
- Diversion of Forest land for the laying of Proposed Underground Water Pipeline… — lapsed, 8.1 km away
- Shri Suleman Ishak Manjothi Reapprasial Area-2.85.31 Pvt. Land & Survey… — environmental approval granted, 8.4 km away
More from Gujarat Energy Transmission Corp LTD in Kachchh
- Clearance of land In Wild Ass Sanctuary (Raising/Shifting of Existing 220 KV… — under wildlife review
- 66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar… — more information requested
- Permission for Diversion of 0.1001 Ha Forest land of Karmata Village, Ta:… — more information requested
- Diversion of forest area of Vira Village, Ta: Anjar, Dist: Kutch for… — more information requested
- Permission for Diversion of 0.4106 Ha Roadside Protected Forest land of… — more information requested
- 220 KV Gadhsisha lilo line from 220 KV Nakhatrana-Nanikhakhar line (Diversion… — forest land use approved
43 Gujarat Energy Transmission Corp projects in Kachchh
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.