66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar Substation

66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar Substation is a proposed road project in Jatavada (Jilar Vand), Rapar, Kachchh, Gujarat. The site covers 158.1 acres. Its stated project cost is ₹18 crore. As of 27 Nov 2026, its status is “More information requested” (since 21 Oct 2026).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar Substation is a proposed road project in Jatavada (Jilar Vand), Rapar, Kachchh, Gujarat. The site covers 158.1 acres.

Who is building it?

The applicant is Gujarat Energy Transmission Corp LTD.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Jatavada (Jilar Vand), Rapar, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹18 crore; a site of 158.1 acres and 360 m² of forest land.

When was it filed?

The application was filed on 2 Sept 2026.

Project details

Official titleConstruction of 66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar Substation
StatusMore information requested
Status since21 Oct 2026
Application filed2 Sept 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantGujarat Energy Transmission Corp LTD
Land area158.1 acres (64 ha)
Forest land360 m²
Project cost₹18 crore
Village / localityJatavada (Jilar Vand)
Taluk / tehsilRapar
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12191

In context

76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 158.1 acres, this one is larger than 94% of them.

Where it is

Jatavada (Jilar Vand), Rapar, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gujarat Energy Transmission Corp LTD in Kachchh

43 Gujarat Energy Transmission Corp projects in Kachchh
All 231 Gujarat Energy Transmission Corp projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.