Quick answers
What is this project?
Diversion of 0.3444 Hectare of Protected Forest Land I.E. Road Side Strip Plantation Declared As Protected Forest for Laying Under Ground (11KV 185 Sq Mm Xlpe With 110mm Pvc Casing) 11KV 185 Sq.Mm Xlpe Cable is a lapsed telecom project in Abrama, Jalalpore, Navsari, Gujarat. The site covers 10.8 acres.
Who is building it?
The applicant is Dipak Gamit.
Has it been approved?
No. The application was lapsed on 17 Sept 2024, so it is no longer under consideration.
Where is it?
In Abrama, Jalalpore, Navsari, Gujarat.
How big is it?
It has a stated cost of ₹20 crore; a site of 10.8 acres and 3,440 m² of forest land.
When was it filed?
The application was filed on 19 Jun 2024.
Project details
| Official title | Diversion of 0.3444 Hectare of Protected Forest Land I.E. Road Side Strip Plantation Declared As Protected Forest for Laying Under Ground (11KV 185 Sq Mm Xlpe With 110mm Pvc Casing) 11KV 185 Sq.Mm Xlpe Cable Under Rdss Scheme of Dgvcl to Various En-Route Villages in Taluka Navsari of District Navsari. |
|---|---|
| Status | Lapsed |
| Status since | 17 Sept 2024 |
| Application filed | 19 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Dipak Gamit |
| Land area | 10.8 acres (4.4 ha) |
| Forest land | 3,440 m² |
| Project cost | ₹20 crore |
| Village / locality | Abrama |
| Taluk / tehsil | Jalalpore |
| District | Navsari |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13554 |
In context
6 applications in Navsari since January 2022 are in the same category (Telecom): 1 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abrama, Jalalpore, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Education use, Residential, Student Hostel & Development for GMERS — under environmental review, 700 m away
- Permission for Diversion of 0.0714 ha Protected forest land for Approach road… — forest land use approved, 4.7 km away
- Diversion of 11.3850 Ha. Protected Forest Land for Road Widening and… — more information requested, 4.9 km away
- 125/63/32 mm dia PE Extension for connecting 30 Nos. Prospect Domestic… — forest land use approved, 5.5 km away
- Up-Gradation of Fish Landing Centre at Chijgam/Rana Bhata, District Navsari,… — coastal clearance granted, 5.7 km away
- Diversion of 0.2800 Hectare of Protected Forest Land I.E. Road Side Strip… — lapsed, 6.3 km away
- Bridge across Kanai Creek connecting Krushnapur-Onjal-Dandi — coastal clearance granted, 7 km away
- Protection Wall Against Sea Erosion of Coast — lapsed, 7.4 km away
More from Dipak Gamit in Navsari
- Diversion of 0.0400 ha Protected forest land for Approach road for… — forest land use approved
- Permission for Diversion of 0.0714 ha Protected forest land for Approach road… — forest land use approved
- Diversion of 0.8625 ha. Protected Forest land for road widening and… — lapsed
- Diversion of 0.0413 ha Protected forest land for Approach road for… — lapsed
- Diversion of 0.8190 ha Reserved forest land for Approach road for Construction… — lapsed
- Diversion of 0.8460 ha Reserved forest land for Construction of Road — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.