Quick answers
What is Ground Mounted Panel installed Solar Park?
Ground Mounted Panel installed Solar Park is an approved power project in Narvadi, Sagbara, Narmada, Gujarat. It seeks 0 acres of forest land.
Who is building it?
The applicant is Kpi Green Energy Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 5 Aug 2026), as of 27 Nov 2026.
Where is it?
In Narvadi, Sagbara, Narmada, Gujarat.
How big is it?
It has a stated cost of ₹5 lakh and 20 m² of forest land.
When was it filed?
The application was filed on 21 Oct 2024.
Project details
| Official title | Development of Ground Mounted Panel installed Solar Park at Sagbara District Narmada. Diversion of proposed Forest Area 0.0015 Ha |
|---|---|
| Status | Forest land use approved |
| Status since | 5 Aug 2026 |
| Application filed | 21 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Kpi Green Energy Limited |
| Forest land | 20 m² |
| Project cost | ₹5 lakh |
| Village / locality | Narvadi |
| Taluk / tehsil | Sagbara |
| District | Narmada |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12356 |
In context
15 applications in Narmada since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Narvadi, Sagbara, Narmada, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 1.1 km away
- Request to grant permission for Jakhvav to Selamba to Akkalkuva OFC Cable… — lapsed, 1.5 km away
- Diversion of 0.090 Ha. Protected Forest Land for Construct Approach road for… — forest land use approved, 1.8 km away
- Bharatnet Phase 2 — lapsed, 2.2 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 6 km away
- Narmada 4G Saturation USOF project VVIP Case — more information requested, 7.5 km away
- Diversion of Forest Land of 2.8392 Hac for forest clearance for Supply,… — initial checks, 7.6 km away
- 4G Saturation USOF Project Devsaki village Sagbara — forest land use approved, 11.5 km away
All 37 Kpi Green Energy projects across India