Quick answers
What is 4G Saturation USOF Project Devsaki village Sagbara?
4G Saturation USOF Project Devsaki village Sagbara is an approved telecom project in Devsaki, Sagbara, Narmada, Gujarat. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 5 Oct 2026), as of 27 Nov 2026.
Where is it?
In Devsaki, Sagbara, Narmada, Gujarat.
How big is it?
It has a stated cost of ₹1.3 crore; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 9 Mar 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 5 Oct 2026 |
| Application filed | 9 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1.3 crore |
| Village / locality | Devsaki |
| Taluk / tehsil | Sagbara |
| District | Narmada |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14369 |
In context
9 applications in Narmada since January 2022 are in the same category (Telecom): 1 approved, 3 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Devsaki, Sagbara, Narmada, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Narmada 4G Saturation USOF project VVIP Case — more information requested, 7.3 km away
- Diversion of Forest Land of 2.8392 Hac for forest clearance for Supply,… — initial checks, 9.7 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 10.6 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 10.8 km away
- Ground Mounted Panel installed Solar Park — forest land use approved, 11.5 km away
- Request to grant permission for Jakhvav to Selamba to Akkalkuva OFC Cable… — lapsed, 11.7 km away
- Diversion of 0.090 Ha. Protected Forest Land for Construct Approach road for… — forest land use approved, 11.7 km away
- Bharatnet Phase 2 — lapsed, 11.8 km away
More from Mahesh Nair in Narmada
- BSNL Mahubadi village Mobile Tower — lapsed
- Narmada 4G Saturation USOF project VVIP Case — more information requested
- Kevadiya Gujarat 4G Saturation USOF Project — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.