Diversion of Forest Land of 2.8392 Hac for forest clearance for Supply, Erection, Testing & Commissioning of LILO of one circuit of 220kv Ukai (Hydro) – Achhaliya line at 220kv Sarvala S/s 88.683 km on D/C & M/C tower with AL-59 conductor (61/3.50) and OPGW cable is a proposed power project in Ambadevi Alias Siyal, Dediapada, Narmada, Gujarat. It seeks 7 acres of forest land.
Who is building it?
The applicant is Getco Bharuch.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Ambadevi Alias Siyal, Dediapada, Narmada, Gujarat.
How big is it?
It has 7 acres (2.8 ha) of forest land.
When was it filed?
The application was filed on 2 Aug 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 3 Aug 2026 |
| Application filed | 2 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Getco Bharuch |
| Forest land | 7 acres (2.8 ha) |
| Village / locality | Ambadevi Alias Siyal |
| Taluk / tehsil | Dediapada |
| District | Narmada |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14215 |
In context
15 applications in Narmada since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected.
Where it is
Ambadevi Alias Siyal, Dediapada, Narmada, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ground Mounted Panel installed Solar Park — forest land use approved, 7.6 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 7.7 km away
- Request to grant permission for Jakhvav to Selamba to Akkalkuva OFC Cable… — lapsed, 8.9 km away
- Diversion of 0.090 Ha. Protected Forest Land for Construct Approach road for… — forest land use approved, 9.1 km away
- Bharatnet Phase 2 — lapsed, 9.6 km away
- 4G Saturation USOF Project Devsaki village Sagbara — forest land use approved, 9.7 km away
- Narmada 4G Saturation USOF project VVIP Case — more information requested, 11.1 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 12.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.