Quick answers
What is this project?
Diversion of 4.9206 ha. Protected Forest Land for construction of elevated viaduct and 7 stations for Metro Rail Project (Package C3) from Sector -1 to Mahatma Mandir in Gandhinagar City is an approved railway project in Gandhinagar (Nac), Gandhinagar, Gujarat. The site covers 12.2 acres.
Who is building it?
The applicant is Gujarat Metro Rail Corporation (Gmrc) Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 1 May 2026), as of 27 Nov 2026.
Where is it?
In Gandhinagar (Nac), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹723 crore; a site of 12.2 acres and 12.2 acres (4.9 ha) of forest land.
When was it filed?
The application was filed on 6 Jul 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 1 May 2026 |
| Application filed | 6 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Gujarat Metro Rail Corporation (Gmrc) Limited |
| Land area | 12.2 acres (4.9 ha) |
| Forest land | 12.2 acres (4.9 ha) |
| Project cost | ₹723 crore |
| Village / locality | Gandhinagar (Nac) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12489 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Jul 2023 (this page) | Forest land use approved | 12.2 acres | ₹723 crore |
| New project filed 4 May 2023 | Lapsed | 8.9 acres | ₹723 crore |
In context
87 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gandhinagar (Nac), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 4.9206 ha. Protected Forest Land for construction of elevated… — lapsed, 300 m away
- Diversion of Forest Land (Area - 19.9168 Ha) for Non-Forest Purposes for the… — under forest review, 500 m away
- Diversion of (Area 0.0215 Ha.) Forest Land for Laying of 100 Mm Dia Ofc and… — lapsed, 550 m away
- Water Supply to the population of Gandhinagar City (24 x 7) under Smart City… — lapsed, 750 m away
- Water Supply to the population of Gandhinagar City (24 x 7) under Smart City… — lapsed, 750 m away
- Diversion of Forest Land for the Non-Forest Purpose Construction &… — lapsed, 750 m away
- Construction of road & Junction improvement on CH-05 Gandhinagar — more information requested, 800 m away
- Construction of road & junction Improvement on CH 05 Gandhinagar — lapsed, 800 m away
All 6 Gujarat Metro Rail Corporation (Gmrc) projects across India