Quick answers
What is this project?
Diversion of Forest Land for the Non-Forest Purpose Construction & Installation of Pedestrian Push Button System and Underground 40 Mm Dia Underground Cable on Various Locations in Gandhinagar City Under Safe Corridor Demonstration Program (Scdp)of Second Gujarat State Highway Project (Project No. Gshp –ii/Scdp-Its-2) in Road Side Plantation Strip of Protected Forest Land Along and Across on Ch Road & Police Bhavan Road is a lapsed telecom project in Gandhinagar (Nac), Gandhinagar, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is State Road Projects Division Vadodara.
Has it been approved?
No. The application was lapsed on 16 Aug 2024, so it is no longer under consideration.
Where is it?
In Gandhinagar (Nac), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0.1 acres and 410 m² of forest land.
When was it filed?
The application was filed on 14 May 2024.
Project details
| Official title | Diversion of Forest Land for the Non-Forest Purpose Construction & Installation of Pedestrian Push Button System and Underground 40 Mm Dia Underground Cable on Various Locations in Gandhinagar City Under Safe Corridor Demonstration Program (Scdp)of Second Gujarat State Highway Project (Project No. Gshp –ii/Scdp-Its-2) in Road Side Plantation Strip of Protected Forest Land Along and Across on Ch Road & Police Bhavan Road in District Gandhinagar.. |
|---|---|
| Status | Lapsed |
| Status since | 16 Aug 2024 |
| Application filed | 14 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | State Road Projects Division Vadodara |
| Land area | 400 m² |
| Forest land | 410 m² |
| Project cost | ₹10 lakh |
| Village / locality | Gandhinagar (Nac) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12300 |
In context
14 applications in Gandhinagar since January 2022 are in the same category (Telecom): 5 approved, 1 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2.4 years from filing to approval. At 0.1 acres, this one is smaller than 86% of them.
99 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gandhinagar (Nac), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land (Area - 19.9168 Ha) for Non-Forest Purposes for the… — under forest review, 250 m away
- Installation and Laying of New Fiber Connectivity at Ru Location Connecting… — lapsed, 300 m away
- Diversion of 4.9206 ha. Protected Forest Land for construction of elevated… — lapsed, 500 m away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC line GMC GIL Police Bhanvan CHH road… — forest land use approved, 650 m away
- Diversion of 4.9206 ha. Protected Forest Land for construction of elevated… — forest land use approved, 750 m away
- Office Building Including annex building and development of bulk services for… — environmental approval granted, 900 m away
- Design, Supply, Installation, Integration, Commission, Operations and… — lapsed, 1 km away
- Diversion of (Area 0.0215 Ha.) Forest Land for Laying of 100 Mm Dia Ofc and… — lapsed, 1.1 km away
More from State Road Projects Division Vadodara in Gandhinagar
- Diversion of (Area 0.0215 Ha.) Forest Land for Laying of 100 Mm Dia Ofc and… — lapsed
- Design, Supply, Installation, Integration, Commission, Operations and… — lapsed
All 3 State Road Projects projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.