Quick answers
What is this project?
Diversion of 4.9206 ha. Protected Forest Land for construction of elevated viaduct and 7 stations for Metro Rail Project (Package C3) from Sector -1 to Mahatma Mandir in Gandhinagar City is a lapsed railway project in Gandhinagar (Nac), Gandhinagar, Gujarat. The site covers 8.9 acres.
Who is building it?
The applicant is Gujarat Metro Rail Corporation (Gmrc) Limited.
Has it been approved?
No. The application was lapsed on 7 Aug 2023, so it is no longer under consideration.
Where is it?
In Gandhinagar (Nac), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹723 crore; a site of 8.9 acres and 12.2 acres (4.9 ha) of forest land.
When was it filed?
The application was filed on 4 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 4.9206 ha. Protected Forest Land for construction of elevated viaduct and 7…
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 Aug 2023 |
| Application filed | 4 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Gujarat Metro Rail Corporation (Gmrc) Limited |
| Land area | 8.9 acres (3.6 ha) |
| Forest land | 12.2 acres (4.9 ha) |
| Project cost | ₹723 crore |
| Village / locality | Gandhinagar (Nac) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12055 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Jul 2023 | Forest land use approved | 12.2 acres | ₹723 crore |
| New project filed 4 May 2023 (this page) | Lapsed | 8.9 acres | ₹723 crore |
In context
96 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gandhinagar (Nac), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land (Area - 19.9168 Ha) for Non-Forest Purposes for the… — under forest review, 250 m away
- Diversion of 4.9206 ha. Protected Forest Land for construction of elevated… — forest land use approved, 300 m away
- Diversion of Forest Land for the Non-Forest Purpose Construction &… — lapsed, 500 m away
- Diversion of (Area 0.0215 Ha.) Forest Land for Laying of 100 Mm Dia Ofc and… — lapsed, 600 m away
- Installation and Laying of New Fiber Connectivity at Ru Location Connecting… — lapsed, 750 m away
- Water Supply to the population of Gandhinagar City (24 x 7) under Smart City… — lapsed, 850 m away
- Water Supply to the population of Gandhinagar City (24 x 7) under Smart City… — lapsed, 850 m away
- Construction of road & Junction improvement on CH-05 Gandhinagar — more information requested, 1 km away
All 6 Gujarat Metro Rail Corporation (Gmrc) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.