What is Set up Solar Power Project in Surat District?
Set up Solar Power Project in Surat District is a lapsed power project in Vadoli, Olpad, Surat, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Kasa Ark LLP.
Has it been approved?
No. The application was lapsed on 28 Dec 2024, so it is no longer under consideration.
Where is it?
In Vadoli, Olpad, Surat, Gujarat.
How big is it?
It has a stated cost of ₹9 lakh; a site of 0.2 acres and 1,020 m² of forest land.
When was it filed?
The application was filed on 26 Nov 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Dec 2024 |
| Application filed | 26 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Kasa Ark LLP |
| Land area | 1,000 m² |
| Forest land | 1,020 m² |
| Project cost | ₹9 lakh |
| Village / locality | Vadoli |
| Taluk / tehsil | Olpad |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12525 |
In context
39 applications in Surat since January 2022 are in the same category (Power): 22 approved, 13 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.2 acres, this one is smaller than 97% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vadoli, Olpad, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Set up Solar Park - Laying 11KV - Three (3-Nos.) Power Cable Transmission Line… — forest land use approved, 0 m away
- Diversion of 0.90 Ha of Protected Forest Land for Widening and Strengthening… — more information requested, 850 m away
- Submission of 0.2806 Hac. Forest land proposal for Diversion for Social Forest… — lapsed, 850 m away
- Diversion of 0.0020 ha. of PF land for laying of 6" Dia. NB Steel Gas Pipeline… — more information requested, 1.4 km away
- Aug. Variyav Reginal Water Supply Scheme Ph-2 — lapsed, 2 km away
- Traffic safety improvement at the existing Vadoli Main Road × Kim Road junction — more information requested, 8.4 km away
- Diversion Of 0.2003 Ha. Protected Forest Land For The Grant Permission For… — lapsed, 8.7 km away
- Petronet LNG Limited, Dahej to Torrent SUGEN Mega Power Plant Project of TPL — more information requested, 8.8 km away