Quick answers
What is this project?
Set up Solar Park - Laying 11KV - Three (3-Nos.) Power Cable Transmission Line on SH-65 (Kim – Vadoli Road),Vadoli Village, Taluka Olpad, Dist - Surat on route from Vadoli Solar Park Pooling Sub-Station to GETCO 66KV Vadoli Sub-Station, Taluka Vadoli, District Surat – Diversion of Protected Forest Area: 0.0995 Ha is an approved power project in Vadoli, Olpad, Surat, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Ravi Exports Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 25 Aug 2026), as of 27 Nov 2026.
Where is it?
In Vadoli, Olpad, Surat, Gujarat.
How big is it?
It has a stated cost of ₹9 lakh; a site of 0.2 acres and 1,000 m² of forest land.
When was it filed?
The application was filed on 27 Jan 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 25 Aug 2026 |
| Application filed | 27 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Ravi Exports Limited |
| Land area | 1,000 m² |
| Forest land | 1,000 m² |
| Project cost | ₹9 lakh |
| Village / locality | Vadoli |
| Taluk / tehsil | Olpad |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12649 |
In context
39 applications in Surat since January 2022 are in the same category (Power): 22 approved, 13 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.2 acres, this one is smaller than 97% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vadoli, Olpad, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Set up Solar Power Project in Surat District — lapsed, 0 m away
- Diversion of 0.90 Ha of Protected Forest Land for Widening and Strengthening… — more information requested, 850 m away
- Submission of 0.2806 Hac. Forest land proposal for Diversion for Social Forest… — lapsed, 850 m away
- Diversion of 0.0020 ha. of PF land for laying of 6" Dia. NB Steel Gas Pipeline… — more information requested, 1.4 km away
- Aug. Variyav Reginal Water Supply Scheme Ph-2 — lapsed, 2 km away
- Traffic safety improvement at the existing Vadoli Main Road × Kim Road junction — more information requested, 8.4 km away
- Diversion Of 0.2003 Ha. Protected Forest Land For The Grant Permission For… — lapsed, 8.7 km away
- Petronet LNG Limited, Dahej to Torrent SUGEN Mega Power Plant Project of TPL — more information requested, 8.7 km away