Quick answers
What is this project?
Diversion of 22.8 Ha. Protected Forest Land for Widening of Existing Wadhwan - Kholdiyad - Fulgram Road is a proposed road project in Fulgram, Wadhwan, Surendranagar, Gujarat. The site covers 56.3 acres.
Who is building it?
The applicant is Patel Dushyant R.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Fulgram, Wadhwan, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹83.7 crore; a site of 56.3 acres and 56.3 acres (22.8 ha) of forest land.
When was it filed?
The application was filed on 29 Jul 2024.
Project details
| Official title | Proposal for Diversion of 22.8 Ha. Protected Forest Land for Widening of Existing Wadhwan - Kholdiyad - Fulgram Road in Surendranagar District |
|---|---|
| Status | More information requested |
| Status since | 29 Apr 2026 |
| Application filed | 29 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Patel Dushyant R |
| Land area | 56.3 acres (22.8 ha) |
| Forest land | 56.3 acres (22.8 ha) |
| Project cost | ₹83.7 crore |
| Village / locality | Fulgram |
| Taluk / tehsil | Wadhwan |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12536 |
In context
12 applications in Surendranagar since January 2022 are in the same category (Roads & highways): 1 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. At 56.3 acres, this one is larger than 82% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Fulgram, Wadhwan, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — more information requested, 3.5 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — lapsed, 3.5 km away
- Industrial project by M/s. T4 Tapes Pvt. Ltd. — environmental approval granted, 8.4 km away
- For approach road of 66kV Rampara Substation — forest land use approved, 8.9 km away
- For approach road of 66kV Rampara Substation — lapsed, 8.9 km away
- For Approach Road For 66kV Rampara S/S — not approved, 8.9 km away
- 90mm Dia PE GAS PIPELINE for Laid on Both Side of SH-17 for Future… — forest land use approved, 9 km away
- Permission for Laying Drinking Water Pipeline in 0.092 Ha. Protected Forest… — forest land use approved, 9.1 km away
More from Patel Dushyant R in Surendranagar
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.