Quick answers
What is this project?
90mm Dia PE GAS PIPELINE for Laid on Both Side of SH-17 for Future Connectivity of Various Upcoming Township , Ta: Surendranagar Dist: Surendranagar is an approved pipeline project in Kherali, Wadhwan, Surendranagar, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Apr 2026), as of 27 Nov 2026.
Where is it?
In Kherali, Wadhwan, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.2 acres and 960 m² of forest land.
When was it filed?
The application was filed on 20 Jan 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Apr 2026 |
| Application filed | 20 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 1,000 m² |
| Forest land | 960 m² |
| Project cost | ₹50 lakh |
| Village / locality | Kherali |
| Taluk / tehsil | Wadhwan |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13436 |
In context
26 applications in Surendranagar since January 2022 are in the same category (Pipelines): 16 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 0.2 acres, this one is smaller than 57% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kherali, Wadhwan, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Imperial Mall — environmental approval granted, 2.6 km away
- 90mm Dia PE GAS Pipeline for laid on Both Side of SH-17 for BAPS Temple… — forest land use approved, 2.7 km away
- Proposed Expansion of Synthetic Organic Chemicals (Reactive Dyes)manufacturing… — environmental approval granted, 3.6 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — more information requested, 6.5 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — lapsed, 6.5 km away
- Industrial project by M/s. T4 Tapes Pvt. Ltd. — environmental approval granted, 6.9 km away
- Shri Mulrajsinh Ghanshyamsinh Parmar — lapsed, 7.2 km away
- Ajaysinh Gajendrasinh Zala — not approved, 8.5 km away
More from Gujarat Gas Limited in Surendranagar
- 125/90 MM Dia PE Gas Pipeline to Connect DCS to Upcoming Domestic Connectivity… — forest land use approved
- 125 Mm Pe Gas Pipeline to Connect Upcoming New Industrial Connection Jay… — forest land use approved
- 90mm Dia. Pe Natural Gas Pipeline Parallel and Crossing to Chuda Bhrugupur… — forest land use approved
- 90mm Dia PE GAS Pipeline for laid on Both Side of SH-17 for BAPS Temple… — forest land use approved
- Rajrishi Petroleum CNG Station Connectivity — forest land use approved
- 125 mm Dia. PE Gas Pipeline route Rajrajeshwardham Jhakhan To Ahmedabad… — forest land use approved
7 Gujarat Gas projects in Surendranagar
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.