Quick answers
What is this project?
Diversion of 2.087 Ha Reserved Forest Land for Hazira Port Railway Connectivity, Vill-Shivrampur(Suvali), Tal-Choryasi, Dist-Surat, State-Gujarat is a proposed railway project in Sunvali, Chorasi, Surat, Gujarat. The site covers 5.6 acres.
Who is building it?
The applicant is Adani Tracks Management Services Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Sunvali, Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹371 crore; a site of 5.6 acres and 5.2 acres (2.1 ha) of forest land.
When was it filed?
The application was filed on 1 Jun 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 2 Jun 2026 |
| Application filed | 1 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Adani Tracks Management Services Limited |
| Land area | 5.6 acres (2.3 ha) |
| Forest land | 5.2 acres (2.1 ha) |
| Project cost | ₹371 crore |
| Village / locality | Sunvali |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12773 |
In context
7 applications in Surat since January 2022 are in the same category (Railways & metro): 4 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sunvali, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Deep Draft Green Field Captive Port — environmental approval granted, 550 m away
- Grant of Permission Required for laying of Drinking water pipeline, crossing /… — forest land use approved, 700 m away
- Diversion of 0.2596 ha. of PF land for laying of 90 mm dia. MDPE Gas Pipeline… — forest land use approved, 750 m away
- Name change to ArcelorMittal Nippon Steel India Private Limited – Diversion of… — lapsed, 850 m away
- Deep Draft Green Field Captive Port — lapsed, 950 m away
- Proposed Expansion of Captive Power Plant Capacity from 270 MW to 300 MW — environmental approval granted, 1.1 km away
- Proposed Expansion of Captive Power Plant Capacity from 270 MW to 300 MW — environmental approval granted, 1.1 km away
- Proposed Expansion of Captive Power Plant Capacity from 270 MW to 300 MW — environmental approval granted, 1.1 km away
All 3 Adani Tracks Management projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.