What is this project?
EPC work for construction of Pipeline Line Project from Tappar Dam to Nirona Dam (Northern Link) is a proposed water and irrigation project in Chandrani, Anjar, Kachchh, Gujarat. The site covers 10.4 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chandrani, Anjar, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1,350 crore; a site of 10.4 acres and 10.4 acres (4.2 ha) of forest land.
When was it filed?
The application was filed on 10 May 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 10 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Department of Irrigation |
| Land area | 10.4 acres (4.2 ha) |
| Forest land | 10.4 acres (4.2 ha) |
| Project cost | ₹1,350 crore |
| Village / locality | Chandrani |
| Taluk / tehsil | Anjar |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12808 |
In context
14 applications in Kachchh since January 2022 are in the same category (Water & irrigation): 0 approved, 3 filed or under review, and 11 withdrawn, lapsed or rejected. At 10.4 acres, this one is larger than 62% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandrani, Anjar, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 66 KV Transmission line from Tappar Substation to MPS-2 Rapar Khokhara… — forest land use approved, 1.1 km away
- Diversion of roadside protected forest for Construction of approach road and… — forest land use approved, 1.3 km away
- Approach for our company Manaksia Coated Metals and Industries Limited — forest land use approved, 1.9 km away
- Approach Roads for Approach Access to Our Company — lapsed, 1.9 km away
- Shri Shamjibhai Haribhai Dhila. — environmental approval granted, 7.6 km away
- Industrial project by Shree Salasar Decor Pvt. Ltd. — environmental approval granted, 7.7 km away
- Sai BMW Services — under environmental review, 7.8 km away
- Integrated Stainless-Steel Plant Comprising of Steel Melting Shop of 2,08,400… — environmental approval granted, 8 km away
More from Department of Irrigation in Kachchh
- Providing Irrigation Water Facility and filling various tanks of Khadir Region… — under forest review
- Epc Work for Construction of Pipeline Project From Tappar Dam to Nirona Dam… — more information requested
- EPC works for Pipeline Project from MPS-3 — more information requested
- Diversion of Forest Land for Saran Sarovar Project in Ta: Rapar, Dist: Kutch — under forest review
- Diversion of Forest Land for Saran Sarovar Project in Ta: Rapar, Dist: Kutch… — not approved
- Laying of Under Ground Water Pipeline for the Irrigation Purpose — under wildlife review
13 Department of Irrigation, Gujarat projects in Kachchh
All 42 Department of Irrigation, Gujarat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.