Quick answers
What is this project?
Diversion of Forest Land for Saran Sarovar Project in Ta: Rapar, Dist: Kutch in Favour of Executive Engineer, Salinity Control Division, Bhuj - Kachchh is a rejected water and irrigation project in Anandpar, Rapar, Kachchh, Gujarat. The site covers 1,301.6 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
No. The application was rejected on 20 Jan 2025.
Where is it?
In Anandpar, Rapar, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹56 lakh; a site of 1,301.6 acres and 1,301.6 acres (526.7 ha) of forest land.
When was it filed?
The application was filed on 28 Dec 2024.
Project details
| Status | Not approved |
|---|---|
| Status since | 20 Jan 2025 |
| Application filed | 28 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Department of Irrigation |
| Land area | 1,301.6 acres (526.7 ha) |
| Forest land | 1,301.6 acres (526.7 ha) |
| Project cost | ₹56 lakh |
| Village / locality | Anandpar |
| Taluk / tehsil | Rapar |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13282 |
In context
14 applications in Kachchh since January 2022 are in the same category (Water & irrigation): 0 approved, 3 filed or under review, and 11 withdrawn, lapsed or rejected. At 1,301.6 acres, this one is larger than 85% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anandpar, Rapar, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Saran Sarovar Project in Ta: Rapar, Dist: Kutch — under forest review, 0 m away
- Laying of Underground Water Pipeline for Irrigation Purpose — lapsed, 4.3 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Forest Division Kutch East,… — application filed, 8.1 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Forest Division Kutch East,… — in-principle approval, conditions pending, 9.3 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : Balasar-Fatehgadh via… — under wildlife review, 9.5 km away
- Laying of Underground Water Pipeline Through the Area of the Wildass Sanctuary — under wildlife review, 9.8 km away
- 66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar… — more information requested, 10.7 km away
- 66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar… — application filed, 10.7 km away
More from Department of Irrigation in Kachchh
- Providing Irrigation Water Facility and filling various tanks of Khadir Region… — under forest review
- Epc Work for Construction of Pipeline Project From Tappar Dam to Nirona Dam… — more information requested
- EPC works for Pipeline Project from MPS-3 — more information requested
- Diversion of Forest Land for Saran Sarovar Project in Ta: Rapar, Dist: Kutch — under forest review
- Laying of Under Ground Water Pipeline for the Irrigation Purpose — under wildlife review
- Diversion Roadside Protected Forest land for the laying of Underground Water… — forest land use approved
13 Department of Irrigation, Gujarat projects in Kachchh
All 42 Department of Irrigation, Gujarat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.