Quick answers
What is this project?
Epc Work for Construction of Pipeline Project From Tappar Dam to Nirona Dam (Northern Link) is a proposed pipeline project in Chapreli, Bhuj, Kachchh, Gujarat. The site covers 50.3 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chapreli, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1,350 crore; a site of 50.3 acres and 6.6 acres (2.7 ha) of forest land.
When was it filed?
The application was filed on 18 Feb 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 27 Sept 2026 |
| Application filed | 18 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Department of Irrigation |
| Land area | 50.3 acres (20.3 ha) |
| Forest land | 6.6 acres (2.7 ha) |
| Project cost | ₹1,350 crore |
| Village / locality | Chapreli |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-13179 |
In context
59 applications in Kachchh since January 2022 are in the same category (Pipelines): 21 approved, 25 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 50.3 acres, this one is larger than 82% of them.
50 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chapreli, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thacker Vinod Maganlal. — environmental approval granted, 3.1 km away
- Thacker Vinod Maganlal. — cleared for impact study, 3.1 km away
- Ranjitbhai Satishbhai Chhanga — lapsed, 3.3 km away
- Vejiben Satish Chhanga — initial checks, 3.4 km away
- Vejiben Satish Chhanga — cleared for impact study, 3.4 km away
- Shri Gagal Mohan Karman — environmental approval granted, 3.5 km away
- Shri Gagal Mohan Karman — cleared for impact study, 3.5 km away
- Shri Pravin Virjibhai Patel. — environmental approval granted, 3.6 km away
More from Department of Irrigation in Kachchh
- Providing Irrigation Water Facility and filling various tanks of Khadir Region… — under forest review
- EPC works for Pipeline Project from MPS-3 — more information requested
- Diversion of Forest Land for Saran Sarovar Project in Ta: Rapar, Dist: Kutch — under forest review
- Diversion of Forest Land for Saran Sarovar Project in Ta: Rapar, Dist: Kutch… — not approved
- Laying of Under Ground Water Pipeline for the Irrigation Purpose — under wildlife review
- Diversion Roadside Protected Forest land for the laying of Underground Water… — forest land use approved
13 Department of Irrigation, Gujarat projects in Kachchh
All 42 Department of Irrigation, Gujarat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.