Quick answers
What is this project?
63/125 MM Dia PE Gas Pipeline For Catering Domestic, Commercial & Industrial Costumers At Suzlon Energy, BKT Industry, Ajit Industry & Hotel Hastik, Taluka:Bhuj Dist:Kutch is an approved pipeline project in Padhar, Bhuj, Kachchh, Gujarat. The site covers 0 acres.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 6 Jan 2025), as of 27 Nov 2026.
Where is it?
In Padhar, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹11 lakh; a site of 0 acres and 80 m² of forest land.
When was it filed?
The application was filed on 6 Dec 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 6 Jan 2025 |
| Application filed | 6 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 100 m² |
| Forest land | 80 m² |
| Project cost | ₹11 lakh |
| Village / locality | Padhar |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12813 |
In context
59 applications in Kachchh since January 2022 are in the same category (Pipelines): 21 approved, 25 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
111 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Padhar, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 8" Steel Gas Pipeline Connectivity from BK to Dwarkesh Petroleum Ta: Bhuj Dist… — forest land use approved, 100 m away
- Construction of Approach Road Through the Roadside Protected Forest — forest land use approved, 150 m away
- Approach Roads for Survery No. 741/13 and Survey No. 457 of Village: Paddhar,… — forest land use approved, 300 m away
- Xtron Industries — under environmental review, 900 m away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — environmental approval granted, 950 m away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant, 950 m away
- Expansion of Carbon Black Manufacturing Facility (6.6 LTPA to 8.0 LTPA) with… — returned to applicant, 1.3 km away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant, 1.3 km away
More from Gujarat Gas Limited in Kachchh
- Diversion of 0.0036 HA. of PF land for Bholenath CNG & Venus Pipe Industry… — more information requested
- Gas Distribution Network — lapsed
- Diversion of 0.00096 HA. of PF land for Connectivity From Fdodo CNG-Ashapura… — more information requested
- (1) 125/ 63mm Dia PE Pipeline For Mundra, Old Bandar Road and Nana Kapaya… — forest land use approved
- 4" Dia Steel Gas Pipeline Connectivity for DRS Station Near Dhaneti Village,… — forest land use approved
- 125/ 63mm Dia PE Pipeline For Mundra, Old Bandar Road and Nana Kapaya Jindal… — lapsed
17 Gujarat Gas projects in Kachchh
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.