Returned to applicantIndustry · Kachchh, Gujarat

Expansion of Carbon Black Manufacturing Facility (6.6 LTPA to 8.0 LTPA) with CPP 160 MW to 240 MW, Off the road Tire – 3.99 LTPA, On the road Tire – 2.01 LTPA, Mould/Drum Plant Facility: 5000 Nos/Annum, Dip Roll Fabric (Man Made Fabric)- 75000 TPA, Wheel Rims - 1000 Nos/day, Tire Recycling & Re-trading: 75,000 TPA Township: BUA 100,000 sqm, Speciality hospital: BUA 10,000 sqm with Industrial built-up area 13,80,990 sqm

Expansion of Carbon Black Manufacturing Facility (6.6 LTPA to 8.0 LTPA) with CPP 160 MW to 240 MW, Off the road Tire – 3.99 LTPA, On the road Tire – 2.01 LTPA, Mould/Drum Plant Facility: 5000 Nos/Annum, Dip Roll Fabric (Man Made Fabric)- 75000 TPA, Wheel Rims - 1000 Nos/day, Tire Recycling & Re-trading: 75,000 TPA Township: BUA 100,000 sqm, Speciality hospital: BUA 10,000 sqm with Industrial built-up area 13,80,990 sqm is a proposed industrial project in Vadvara, Bhuj, Kachchh, Gujarat. The site covers 1,390.3 acres. Its stated project cost is ₹19,400 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 1 Nov 2026).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Carbon Black Manufacturing Facility (6.6 LTPA to 8.0 LTPA) with CPP 160 MW to 240 MW, Off the road Tire – 3.99 LTPA, On the road Tire – 2.01 LTPA, Mould/Drum Plant Facility: 5000 Nos/Annum, Dip Roll Fabric (Man Made Fabric)- 75000 TPA, Wheel Rims - 1000 Nos/day, Tire Recycling & Re-trading: 75,000 TPA Township: BUA 100,000 sqm, Speciality hospital: BUA 10,000 sqm with Industrial built-up area 13,80,990 sqm is a proposed industrial project in Vadvara, Bhuj, Kachchh, Gujarat. The site covers 1,390.3 acres.

Who is building it?

The applicant is Balkrishna Industries Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Vadvara, Bhuj, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹19,400 crore and a site of 1,390.3 acres.

When was it filed?

The application was filed on 6 Oct 2026.

Project details

StatusReturned to applicant
Status since1 Nov 2026
Application filed6 Oct 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBalkrishna Industries Limited
Land area1,390.3 acres (562.6 ha)
Project cost₹19,400 crore
Village / localityVadvara
Taluk / tehsilBhuj
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-10868

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,390.3 acres, this one is larger than 96% of them.

71 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vadvara, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Balkrishna Industries Limited in Kachchh

All 13 Balkrishna Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.