Quick answers
What is this project?
Approach Roads for Survery No. 741/13 and Survey No. 457 of Village: Paddhar, Ta: Bhuj Dist: Kutch is an approved road project in Padhar, Bhuj, Kachchh, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Balkrishna Industries Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 21 Apr 2025), as of 27 Nov 2026.
Where is it?
In Padhar, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹7 lakh; a site of 0.1 acres and 510 m² of forest land.
When was it filed?
The application was filed on 1 Apr 2025.
Project details
| Official title | Construction of Approach Roads for Survery No. 741/13 and Survey No. 457 of Village: Paddhar, Ta: Bhuj Dist: Kutch |
|---|---|
| Status | Forest land use approved |
| Status since | 21 Apr 2025 |
| Application filed | 1 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Balkrishna Industries Limited |
| Land area | 500 m² |
| Forest land | 510 m² |
| Project cost | ₹7 lakh |
| Village / locality | Padhar |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12636 |
In context
76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 79% of them.
106 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Padhar, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Approach Road Through the Roadside Protected Forest — forest land use approved, 150 m away
- 63/125 MM Dia PE Gas Pipeline For Catering Domestic, Commercial & Industrial… — forest land use approved, 300 m away
- 8" Steel Gas Pipeline Connectivity from BK to Dwarkesh Petroleum Ta: Bhuj Dist… — forest land use approved, 400 m away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — environmental approval granted, 650 m away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant, 650 m away
- Expansion of Carbon Black Manufacturing Facility (6.6 LTPA to 8.0 LTPA) with… — returned to applicant, 1 km away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant, 1 km away
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — withdrawn, 1 km away
More from Balkrishna Industries Limited in Kachchh
- Expansion of Carbon Black Manufacturing Facility (6.6 LTPA to 8.0 LTPA) with… — returned to applicant
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — environmental approval granted
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — withdrawn
- Balkrishna Industry Township — environmental approval granted
All 13 Balkrishna Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.