Quick answers
What is this project?
Diversion of Protected Forest Land for Widening to connect proposed bridge on Galteshwar - Timba - Bardoli Road (SH-165) at. Vill. Kharvasa, Ta. Bardoli, Dist. Surat is a lapsed road project in Kharvasa, Bardoli, Surat, Gujarat. It seeks 0 acres of forest land.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
No. The application was lapsed on 29 Sept 2026, so it is no longer under consideration.
Where is it?
In Kharvasa, Bardoli, Surat, Gujarat.
How big is it?
It has a stated cost of ₹2.6 crore and 30 m² of forest land.
When was it filed?
The application was filed on 10 Apr 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Sept 2026 |
| Application filed | 10 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer |
| Forest land | 30 m² |
| Project cost | ₹2.6 crore |
| Village / locality | Kharvasa |
| Taluk / tehsil | Bardoli |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12080 |
In context
59 applications in Surat since January 2022 are in the same category (Roads & highways): 13 approved, 30 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kharvasa, Bardoli, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of 66 KV Under ground cable line from Exi.220 KV Mota SS to Exi. 66 KV… — lapsed, 2.9 km away
- Proposed Capacity Expansion of Sugar Manufacturing Unit due to Modernization… — environmental approval granted, 3.2 km away
- Proposed Capacity Expansion of Sugar Manufacturing Unit due to Modernization… — environmental approval granted, 3.2 km away
- Proposed Capacity Expansion of Sugar Manufacturing Unit due to Modernization… — more information requested, 3.2 km away
- Diversion of Protected Forest Land for the Work of Construction of Proposed… — more information requested, 3.5 km away
- The proposed production of synthetic organic chemicals manufacturing unit… — environmental approval granted, 3.7 km away
- The proposed production of synthetic organic chemicals manufacturing unit… — cleared for impact study, 3.7 km away
- Diversion of 1.6175 Ha Protected forest land for the work of Construction of… — more information requested, 3.8 km away
More from Executive Engineer in Surat
- Diversion of 34.6289 Ha. of Forest Land for Widening and Strengthening of… — under forest review
- Diversion of 31.5581 Hectare of Forest Land for Widening and Strengthening of… — under forest review
- Diversion of 0.90 Ha of Protected Forest Land for Widening and Strengthening… — more information requested
- Diversion of Protected Forest Land for widening of Umarpada - Ghata Road (ODR)… — more information requested
- Traffic safety improvement at the existing Vadoli Main Road × Kim Road junction — more information requested
- Diversion of Protected Forest Land for widening of Mandvi - Sherulla Road… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.