Project details
| Status | Forest land use approved |
|---|---|
| Status since | 5 May 2026 |
| Application filed | 1 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Gujarat Energy Transmission Corporation Limited |
| Land area | 900 m² |
| Forest land | 910 m² |
| Project cost | ₹8.4 crore |
| Village / locality | Gundaran |
| Taluk / tehsil | Talala |
| District | Gir Somnath |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12993 |
In context
11 applications in Gir Somnath since January 2022 are in the same category (Other): 7 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gundaran, Talala, Gir Somnath, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- UG PVC Pipeline for Irrigation and Drinking Water Purpose — forest land use approved, 3.6 km away
- Diversion of 0.1267 Ha. Protecated Forest Land for Laying 4 Inch Dia Agri… — lapsed, 3.8 km away
- Ug Pipeline for Irrigation and Drinking Water Purpose — forest land use approved, 3.8 km away
- Diversion of 0.0342 Ha. Reserved Forest Land For Laying 4 dia inch Driking… — more information requested, 5.7 km away
- Diversion of 0.1520 Ha. of Protected Forest Land for Laying Underground… — initial checks, 5.7 km away
- Gauge Conversion from MG line to BG line between Talala and Prachi Road… — more information requested, 5.8 km away
- Govindbhai Devshibhai Solanki (Gabha Building Limestone Quarry Area) — environmental approval granted, 6.6 km away
- Shri Varsingh K Bamania — environmental approval granted, 6.7 km away
More from Gujarat Energy Transmission Corporation Limited in Gir Somnath
- Diversion of 0.1447 Hec. Protected Forest Land for Construction of 220 KV… — more information requested
- Diversion of 0.5460 Hac. protected forest land for the construction of new… — more information requested
- Diversion of 0.6525 Hec. of protected forest land for construction of new 66kV… — in-principle approval, conditions pending
- Diversion of 0.0042 Hec. Protected Forest Land for Construction of New 66KV… — forest land use approved
- Diversion of 0.4616 Hec. of protected forest land for construction of new 66kV… — forest land use approved
- Diversion of 0.5110 Hac. protected forest land for the construction of new… — lapsed
9 Gujarat Energy Transmission Corporation projects in Gir Somnath
All 38 Gujarat Energy Transmission Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.