Diversion of 0.5460 Hac. protected forest land for the construction of new 66KV GETCO Substation

Diversion of 0.5460 Hac. protected forest land for the construction of new 66KV GETCO Substation is a proposed power project in Surva, Talala, Gir Somnath, Gujarat. The site covers 1.4 acres. Its stated project cost is ₹7.3 crore. As of 27 Nov 2026, its status is “More information requested” (since 6 Nov 2026).

See it on the live map All projects in Gir Somnath

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleDiversion of 0.5460 Hac. protected forest land for the construction of new 66KV GETCO Substation at Village Surva, Taluka: Talala & Dist.: Gir-Somnath.
StatusMore information requested
Status since6 Nov 2026
Application filed11 Aug 2026
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantGujarat Energy Transmission Corporation Limited
Land area1.4 acres (0.6 ha)
Forest land1.3 acres (0.5 ha)
Project cost₹7.3 crore
Village / localitySurva
Taluk / tehsilTalala
DistrictGir Somnath
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-13363

In context

17 applications in Gir Somnath since January 2022 are in the same category (Power): 3 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected. At 1.4 acres, this one is larger than 80% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Surva, Talala, Gir Somnath, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gujarat Energy Transmission Corporation Limited in Gir Somnath

9 Gujarat Energy Transmission Corporation projects in Gir Somnath
All 38 Gujarat Energy Transmission Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.