Project details
| Official title | Diversion of 0.4616 Hec. of protected forest land for construction of new 66kV S/C line from existing 66kV Dandi S/S to existing 66kV Delwada S/S by laying of 66kV, 630 sq.mm., (3+1) underground cable at Village: Dandi, Khan, Delwada, Tal: Una, Dist: Gir Somnath on State Highway - 104 (Simar - Una Road). |
|---|---|
| Status | Forest land use approved |
| Status since | 7 Sept 2026 |
| Application filed | 24 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corporation Limited |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 1.1 acres (0.5 ha) |
| Project cost | ₹15.2 crore |
| Village / locality | Dandi |
| Taluk / tehsil | Una |
| District | Gir Somnath |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13459 |
In context
17 applications in Gir Somnath since January 2022 are in the same category (Power): 3 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected. At 1.2 acres, this one is larger than 67% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dandi, Una, Gir Somnath, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Haribhai Naranbhai Solanki Reapprasial Area-1.00.00Village - Khan, Taluka… — environmental approval granted, 2.1 km away
- Shri Bahadursinh Chauhan — environmental approval granted, 2.2 km away
- Shree Lakhabhai Boghabhai Dabhi (Anjar Building Limestone) — not approved, 2.3 km away
- Delvada-Khapat via Village Delvada and Gupt Prayag Social Forestry Division… — more information requested, 2.4 km away
- Rathod Janakba Navnitsinh — environmental approval granted, 2.7 km away
- Katariya Rafikbhai Hasanbhai (Una Building Limestone Block-B) — lapsed, 3.7 km away
- Shri Katariya Rafikbhai Hasanbhai — under environmental review, 3.7 km away
- Shri Katariya Rafikbhai Hasanbhai — cleared for impact study, 3.7 km away
More from Gujarat Energy Transmission Corporation Limited in Gir Somnath
- Diversion of 0.1447 Hec. Protected Forest Land for Construction of 220 KV… — more information requested
- Diversion of 0.5460 Hac. protected forest land for the construction of new… — more information requested
- Diversion of 0.6525 Hec. of protected forest land for construction of new 66kV… — in-principle approval, conditions pending
- Diversion of 0.0042 Hec. Protected Forest Land for Construction of New 66KV… — forest land use approved
- Diversion of 0.5110 Hac. protected forest land for the construction of new… — lapsed
- Diversion of 0.0914 Hec. of Forest Land for Construction of New 66KV S/C Line… — forest land use approved
9 Gujarat Energy Transmission Corporation projects in Gir Somnath
All 38 Gujarat Energy Transmission Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.